Loading...
HomeMy WebLinkAboutBLD00-215Waterman &Katz13ui1din8 I87 Quwry Street. Sirite 30] Fart reed wa 9s36a P6®e: (360) 379-3208 Fax: (360) 3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TBIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Permit Number: BLDOO-215 Issued: 11/17/00 Parcel Number: 948000802 Job Address: 705 R Street Zone: RR_II Type: VV=N Occupancy:R-3 deck/storaee Nature of Work: ConstruM 372 square foot deck, stairs and 290 square foot storaee area under deck. Owner: James Jacobson and Christine Becker Contractor: Robert Deberrv 379-2418 """Note: due to nearby Environmentally Sensitive Area (landslide/erosion hazard from steep slope), no disturbance of vegetation along slope or slope's edge is permitted.' •• GENERAL CONDTI'IONS APPLY -SEE LAST PAGE RF.ni)iRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No 2 FOOTING Setbacks ~ ~~'`~~ ~ ~~ Footings Forms Reinforcement Engineered Holddowns Deck Piers FRAMING refer to engineering and plans for engineered shear walls, and ~ n j~~ ~ l ~/ holddowns. All framing members exposed to `~ weather to be pressure treated or wood of natural resistance to decay Walls Engineered Shear walls Engineered Holddowns Ceiling/Roof Deck Windows Air Seal • Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 2 Permit%BLD00-215 FINAL Check for 5" tnmtbers Smoke detectors required throughout per the UBC: one in each. sleeping room and in each area/hallway leading to sleeping rooms with a minimum of one on each, floor Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have s Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of sik fencing and graveled construction entrance. Adjacent rights-of-way sluill be kept free of dirt & debris. Soils ezposed duriug construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adjacent properties. . 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shah review and oversee correction of any and all deficiencies noted by required • inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within sa months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to Iccep your building permit actives 9. Revisions require review and approval orior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours. before you dig for utility line locates 1-800.424-5555 Page 2 of 2