HomeMy WebLinkAboutBLD00-214r
Watemun &. Katz Building
181 Quincy Street, Suite 307
Port Townsend, WA 98368
Phone: (360)379-3208 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BI.D~O-214
Job Address: 1736 Gise Street
Total Occupant Load:2
Issued: 06-22-O1 Parcel Number: 948-305-904
Zoning: RR=II Type: VV=N Occupancy: R-3
Nature of Work: Dormer addition to unheated studio
Owner: Stephen Davis
Contractor: Stephen Davis
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF,nTiTRFT) iNSPF,CTinNS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FLOOR FRAMING @ Loft
Joists
Blocking
Engineered nailing @ floor sheathing
Positive Connections
Treated Wood to .Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
FRAMING
Walls
Engineered Sheer Walls
Ceilings/Loft
Roof
Rafter Positive Connection
Attic Venting - @ eave
Windows -safety glazing
Fire Blocking
Weather Resistive Barrier
S eeial roo nailin er lateral anal sis
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit # BI.D0l~1I4
INSULATION -unheated
DRY WALL NAILING (if applicable)
Walls
Ceiling
FINAL
House Numbers - 5"
Smoke Detectors
Final -Building
U
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 3
Puvtit # BLD00.214
~~
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced welt panels
(ABWP) require inspeMion prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
• minimum of twenty-four hours notice is required. Public Works aoaroval must be received prior to
schedulinE the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved pans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
i