Loading...
HomeMy WebLinkAboutBLD00-214r Watemun &. Katz Building 181 Quincy Street, Suite 307 Port Townsend, WA 98368 Phone: (360)379-3208 Faz: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BI.D~O-214 Job Address: 1736 Gise Street Total Occupant Load:2 Issued: 06-22-O1 Parcel Number: 948-305-904 Zoning: RR=II Type: VV=N Occupancy: R-3 Nature of Work: Dormer addition to unheated studio Owner: Stephen Davis Contractor: Stephen Davis GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,nTiTRFT) iNSPF,CTinNS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FLOOR FRAMING @ Loft Joists Blocking Engineered nailing @ floor sheathing Positive Connections Treated Wood to .Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers FRAMING Walls Engineered Sheer Walls Ceilings/Loft Roof Rafter Positive Connection Attic Venting - @ eave Windows -safety glazing Fire Blocking Weather Resistive Barrier S eeial roo nailin er lateral anal sis Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit # BI.D0l~1I4 INSULATION -unheated DRY WALL NAILING (if applicable) Walls Ceiling FINAL House Numbers - 5" Smoke Detectors Final -Building U Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 3 Puvtit # BLD00.214 ~~ 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced welt panels (ABWP) require inspeMion prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A • minimum of twenty-four hours notice is required. Public Works aoaroval must be received prior to schedulinE the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved pans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 i