Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-210
Watesmm & Katz Buildieg 181 Quincy Street, Suite 301 Pat Townsend, WA 98368 Phate: (360) 379-3206 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-2IO Issued: 11/27/00 Parcel Number: 972-600-401 Job Address: 1920 31st Street Zoning: R-I Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 2/2 Nature of Work: Construct single-family residence w/ garage Owner: Alfred Jubie Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 and SUDP #00-064 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks / Z~~/D D / iYY~~. Footings Forms Reinforcement Interior Footings LIFER • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pemtit # BI.W0.210 REQUIRED INSPECTIONS APPRnVF,>n/nATF, FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Alternate Braced Wall Panel Holdown Hardware FLOOR FRAMING NOTE: Engineered joist plan to be on-site of ,, / n n " time of inspection ~~~ D' _/mil/ l`''~/ Joists ~ Blocking Shield under Posts Positive Connection Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers PLUMBING: Rough-In (D-V-T & Clean outs) ~ ~ n CJ,r/t) 4c- ~/ RBv~/D - ~ 7i C~ ~~ (~ Water Supply Water Hammer Arrestor ~ -I' ©~ I I ~ ~ ~ ~ ~ /je/6/ ~~ t~' ,Y V Hose Bibs (backflow protection required) 1 Pipe Insulation (minimum R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 18" A. F. E R-10 under MECHANICAL Source Specific Fans @ kitchen and laundry Whole House Fan -Bath Environmental Air Exhaust ducting (w/ back draft / / n /J ?// l7' /~ ( r{~ dampers), insulation (min. R-4) and terminus ` ~ t (located 3' from opening) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page2of4 n Pemtit # BI.D00-210 RF.ni1iRED INSPECTIONS APPROVED/DATE FRAMING "NOTE: Engineered roof #russ plan to be on-site at ection s ti f i ; „ ~ I? / ~•7 ` ~~ % (a / ~ p me o n ~ , ~ Walls Alternate Braced Wall Panel Posts, Beams & Headers -per attached Willamette Industries talcs n /~2~~ / ~j6/ G Ceilings Roof Truss Positive Connection Attic Venting - eave and other Windows -escape Window safety glazing Windows Ufactor - .39 or better NFRC window sticker must be on windows And skylights at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor -exempt Fire Blocking Weather Resistive Barrier INSULATION Floor (R=30) 7~~ ~0~ Walls (R-21) v/ Ceiling (R=38 ) Baffles Vapor Barrier: faced Batts/vapor barrier paint DRY WALL NAILING ~ Walls ~// ~, Ceiling 6 % Enclosed space under stairs /r Garage/House Occupancy Separation FINAL Public Works Sign-Off n /~ // House Numbers - 5" minimum L// f/ ~1" ~ l! Plumbing I Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building I ('.all 48 hours before you diQ for utility line locates I-800.424-5555 Page3of4 PvmitN BLD00.210 . GRNF.RA . ('ONDITTONS s~ 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. AL! elements of engineering including nailing, holdowns, sheathing, and a]ternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-~ residential project. 8. All building. permits expire if no progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4