Loading...
HomeMy WebLinkAboutBLD00-209Waterman & Kala auildin8 181 Quinry 54ee1, Suite 371 Pert 7ewofend, WA 98367 Phone: 367J79J208 Fa: S60JH5-7675 • CITY OF PORT TOWNSEND n LJ CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-2O9 Issued: 10/27/00 Parcel Number: 984602004 Job Address: 309 Coserove Street Zoning: R-11 Type: VV=N Occupancy: RR_3 Total Occupant Load: 1 Nature of Work: Construct Detached Caraort for SFR Owner: Ian Groves Contractor: Kozeliskv's Inc. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 u>~nrrTUT: n 11vcrFr'rTnlvc APPR(lVF>n/nATF. TEMP EROSION & SDM'T CONTROL Silt Fence & Drive OffMat as needed during construction to prevent erosion and prohibit tracking of dirt and debris onto City rights-of--way See General Condition #2 FOOTINGS Setbacks (( // / ~~~ T~~~ Footings Per attached engineering, min. 2' below grade Forms Reinforcement Cylindrical Piers 12"x IS"per engineering Call 48 hours before you dig For utility line locates 1-800-424-5555 Page 1 of 3 Building Permit p00.209 REQUIRED INSPECTIONS APPROVED/DATE FRAMING: Walls -pressure treated 6" x 6" Positive Connection Post-to-Pier - CBSQ66 Post-to-Beam Connection - 2"x 6" bracing bath sides with IOd @ 2 " o. c. Engineered Beams: 6" x 12"DF #2 posts Roof -engineered truss plan to be on-site at time of inspection Seismic Tie (e.g., Hl) each truss-to-beam Engineered Sheathing -15/32" CDXw/ IOd nails @ 3"0. c. both ends FINAL ( nn Final -Building ~ ~ ~ 7i Z ~ `+ (~'v GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reEistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and afl deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 3 Building Permit M00-209 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. 10. Revisions require review and approval prior to making changes to the approved plans. Contact the Building Department at 379-3208 prior to making changes to the approved plans. U Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3