Loading...
HomeMy WebLinkAboutBLD00-208Wetem~en & Yals Htilding 181 Quincy Street, Suite 30] Port. Townsend, WA 98368 Phone: (360)379-3208 Faz: (360)3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-2O8 Issued: 11/15/0o Parcel Number: 988802001 Job Address: 1000 Madison Street Zoning:. RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 214 Nature of Work: Construct attached ADU with earaee below Owner: Karen and Matthew Rowe Contractor: Townsend Builders Inc. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ***ALL ELEMENTS OFENGINEERING REQUIRE INSPECTION PRIOR TO COVER*** RF,OT1iRF,D INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive OffMat to restrict sediment from leaving the site and being tracked onto adjacent rights-of way FOOTINGS Setbacks ~ Z f ~/~~ i Footings Forms Reinforcement Interior Footings UFER Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of S Permit # BI,D00-1A6 INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement ~ ~ ~ 31 Anchor Bolts- see shear wall schedule Sheet S2 of plans for bolt spacing at shear walls Engineered Holdowns -see holdawn schedule on Sheet S2 of plans SLAB R-10 required for stairway entry slab and thermal ~ n l ~ / ~ /c3/Q / ll break @ breezeway (\ ~ 1f FLOOR FRAMING - BCI Jloor framing plan to be on-site at time ojinspection ~ l ~ n n / ~ 3 p `lam,( Joists - BCI's @ 12 " o. c. at 18' front section of F-2 ` per engineer; refer toted--lines on Sheet 3 of 9 Blocking Shield under Posts -engineered post base and post Cap COnneCli0Y1S -"~ Positive Connections -engineered anchor connections (LTP4) and straps (LSTA 30 and CSIS) Treated Wood to Concrete Anchor Bolts -see also Shear Wall Schedule, Sheet S2 PLUMBING: Rough-In (D-V-T & Clean outs) ly l / ~1 /J ~~ ~ Gas Supp y ~~V J/ ~~ ~ I Water Hammer Arrester @ clothes & dishwashers (l( Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater- not shown on plans R-10 under if electric and placed on slab 18" A.F.F. if located in garage Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drein to exterior, terminate 6" - 24" above ground Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Permit # BLD00-208 RF.(1TTTRF.T1 TNSPF.(-'TTnNS APPROVED/DATE MECHANICAL -manufacturer's appliance installation instructions shall be on-site at time of inspection Wood Stove LPG Heater .Whole House Fan Source Specific Fan @ Kitchen / ~`~~/ Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) FRAMING Walls -1-hour separation between house &ADU ~ ~ Engineered Shear Walls -block all edges ~/ ~U Ceilings Posts, Beams & Headers - DF #1 per engineering LVL Beams -engineered HGUS 46 hanger connectors Roof -engineered truss plan on-site at time of inspection ~ Rafter/T'russ Positive Connection - HI per engineering; MST27 straps per engineering Roof Venting - soffit vents: 6 sq. ft. req'd Windows Ufactor - .45 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Wall Ports) Doors U-Factor -all glazed; see window U-factor Air Seal Fire Blocking ', Weather Resistive Barrier INSULATION Slab (R=10 with thermal break @ breezeway/stairs) Z~,f~~l ' Walls (R-19 including breezeway/stairway wall) `~ /~ Ceiling (R-38 ) Floors (R-25 ) Vapor Barrier: paint Baffles DRY WALL NAII.ING 1-hour fire resistive construction between house/ADU ~/7 ~©1 Walls v Ceiling Enclosed Space under Stairs Garage/House Occupancy Separation r1 U Ca1148 hours before you dig for utility line locates 1-500-424-5555 Page3of5 Permit#BI.D00-206 REQUIRED INSPECTIONS APPROVED/DATE CHIMNEY Termination Straps Chimney Cap/Spark Arrester FINAL Fire Dept. Sign-Off (LPG) LP6 7 fLl~~b i House Numbers - 5" minimum l1 Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors per 1997 UBC in existing. construction Final -Building .J 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down wh~7e this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shaD be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized wkh mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection cs11385-2294, press 3. A minimum of twenri-tour hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- . residential project. • Call 48 hours before you dig for utility liue locates I-800.424-5555 Page4of5 Prnnit # BLD00-208 • 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval orior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved. plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility liue locates 1-800-424-5555 Page 5 of 5