Permit Number: BLDOO-205R-1 Issued: 12/l/0o Parcel Number: 972902501
Job Address: 888 53rd Street Zoning: R-I Type: VV=N Occupancy: RR=3
Nature of Work: Revision #1• residential remodel -frame and insulate attic space.
Owner: Markus Koch & Jill Silver Contractor: Discovery Bav Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
See also original inspection record
FLOOR FRAMING/FRAMING
Joists
Blocking
Walls
Positive Connection
Guardrails
Handrails
INSULATION
Walls (R-19)
Ceiling (R-38)
Baffles
Vapor Barrier
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemtit NBLD00~205R-1
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor_ & I~dust~ies contractor's reeistration •
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. AU elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is enable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection cal! 355-2294. A_
minimum of twenty-four hours notice is required Public Works aooroval must be received or~or to
scheduhne the Bmldme Department's final msoection
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- •
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Watam®&KaczBUildin6
I81 Qum' Street, Suite 301
Pat Toav+erd. WA 98368
PMm: (360) 3793208 Fez: (360) 365-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-2OS Issued: 11/09!00 Parcel Number: 972902501
Job Address: 888 53rd Street Zoning: R-I Type: V_N Occupancy: R~3
Nature of Work: SFR Interior Remodel: see attached scone of work
Owner: Markus Koch & Jill Silver Contractor: Discovery Bav Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
•
PLUMBING
Rough-In (D-V-T & Clean Outs)
Water Supply
Gas Supply
Water Hammer Arrestor @ clothes and dishwasher
Hose Bibs
Pipe Insulation (R-3}
Pressure Reduction Valve if pressure > 80 psi
Water Heater
R-10 under for electric (LPG prohibited in crawl space
without proper drainage)
Seismic Straps @ 1/3 points w/bottom strap minimum
4" above controls
Pressure relief valve drain to exterior, elbow down, 6" -
24" above grade
Z~lI~OD C~
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
~~
REQUIRED iN5PEC.'TinNS APPRnVFD/IIATF.
LPG Fire
i
A ~~ ~~ Pi [~
on
om ust
ir
venting
3/l/0%l
Source Specific Fans
Environmental Air Exhaust ducting (with backdraft I
~ ~~ `~~
dampers), insulation (R-4), and terminus (located 3' from
openings into building)
FRAMING
Walls
Ceiling ~
l
~ n
Roof ~
Y ~
~( (`r
(/
Attic Venting te
Windows -escape
Window U-factor:.43 or better
NFRC label shall be on windows and doors at time of
inspection
Window Safety Glazing
Air 5ea1
Door U-factor
Rafters
Posts, Beams and Headers
Positive Connection
Fireblocking
Weather Resistive Barrier
CHIl~INEY
Termination
Straps
INSULATION
Floor (R-30 )_ QQ ~ n „
G(~`"'' ~ ~//s/~
JQ
//
`
Walls (R-19) (
~
~
Ceiling (R-38)
Baffles
Vapor Bamer Req'd: 4 mil poly, vapor barrier paint, etc.
6 mil black poly in crawl; lap seams 12"
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 3
Permit NBi.D00-ZOS
FINAL
Fire Department Sign-Off-LPG
House Numbers -check for 5" numbers
Final -Plumbing
Final -Mechanical
Insulation Certificate
Vapor Barrier Paint Certificate (if applicable)
Smoke Detectors in existing construction per '97 UBC
Final -Building
ENERAL CONDTITON
1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and
graveled construMion entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates