Loading...
HomeMy WebLinkAboutBLD00-205Wrtuman & Ketz Building 781 Quinry Street, Suite 301 PM Townend W A 98368 Phone: (360)379-3208 Faz: (360)385-0675 • CITY OF PORT TOWIVSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-205R-1 Issued: 12/l/0o Parcel Number: 972902501 Job Address: 888 53rd Street Zoning: R-I Type: VV=N Occupancy: RR=3 Nature of Work: Revision #1• residential remodel -frame and insulate attic space. Owner: Markus Koch & Jill Silver Contractor: Discovery Bav Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE See also original inspection record FLOOR FRAMING/FRAMING Joists Blocking Walls Positive Connection Guardrails Handrails INSULATION Walls (R-19) Ceiling (R-38) Baffles Vapor Barrier • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemtit NBLD00~205R-1 ENERAL CONDITION 1. Contractors working on this project are required to have a Labor_ & I~dust~ies contractor's reeistration • number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. AU elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is enable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection cal! 355-2294. A_ minimum of twenty-four hours notice is required Public Works aooroval must be received or~or to scheduhne the Bmldme Department's final msoection 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- • residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Watam®&KaczBUildin6 I81 Qum' Street, Suite 301 Pat Toav+erd. WA 98368 PMm: (360) 3793208 Fez: (360) 365-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-2OS Issued: 11/09!00 Parcel Number: 972902501 Job Address: 888 53rd Street Zoning: R-I Type: V_N Occupancy: R~3 Nature of Work: SFR Interior Remodel: see attached scone of work Owner: Markus Koch & Jill Silver Contractor: Discovery Bav Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 • PLUMBING Rough-In (D-V-T & Clean Outs) Water Supply Gas Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs Pipe Insulation (R-3} Pressure Reduction Valve if pressure > 80 psi Water Heater R-10 under for electric (LPG prohibited in crawl space without proper drainage) Seismic Straps @ 1/3 points w/bottom strap minimum 4" above controls Pressure relief valve drain to exterior, elbow down, 6" - 24" above grade Z~lI~OD C~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 ~~ REQUIRED iN5PEC.'TinNS APPRnVFD/IIATF. LPG Fire i A ~~ ~~ Pi [~ on om ust ir venting 3/l/0%l Source Specific Fans Environmental Air Exhaust ducting (with backdraft I ~ ~~ `~~ dampers), insulation (R-4), and terminus (located 3' from openings into building) FRAMING Walls Ceiling ~ l ~ n Roof ~ Y ~ ~( (`r (/ Attic Venting te Windows -escape Window U-factor:.43 or better NFRC label shall be on windows and doors at time of inspection Window Safety Glazing Air 5ea1 Door U-factor Rafters Posts, Beams and Headers Positive Connection Fireblocking Weather Resistive Barrier CHIl~INEY Termination Straps INSULATION Floor (R-30 )_ QQ ~ n „ G(~`"'' ~ ~//s/~ JQ // ` Walls (R-19) ( ~ ~ Ceiling (R-38) Baffles Vapor Bamer Req'd: 4 mil poly, vapor barrier paint, etc. 6 mil black poly in crawl; lap seams 12" Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 3 Permit NBi.D00-ZOS FINAL Fire Department Sign-Off-LPG House Numbers -check for 5" numbers Final -Plumbing Final -Mechanical Insulation Certificate Vapor Barrier Paint Certificate (if applicable) Smoke Detectors in existing construction per '97 UBC Final -Building ENERAL CONDTITON 1. Contractors working on this projeM are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field Contact the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ~--~