HomeMy WebLinkAboutBLD00-204Waterman & Katz Building
181 Quincy St., Suite 30 L
Port Townsend, WA98368
Phone (360) 379-3208 Fax (360) 385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-204 Issued: 10/16/00 Parcel Number: 948327605
Job Address: 1233 Sims Wav Zoning: CC=II Type: VV=N Occupancy: B
Total Occupant Load: No Change Nature of Work: Remove ezistina wood shinele roof,
replace sheetine and install asphalt shinele roof.
Owner: Jim Tavernakis
Contractor: Hone Roofine
GENERAL CONDTI'IONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLTITON
All construction debris to be deposited in
Jefferson County Landfill per plans or other
location in accordance with all local, state
and federal laws.
SHEATHING
1/2" CDX plywood requires 8d @ 6" o.c.
edges & 12" field or 1'/<" staples @ 6" o.c.
edges and field.
ROOF VENTING
Ridge and Eave
FINAL
Building Numbers - 5" numbers of
contrasting color posted near main entrance
of house and visible from street per City
Ordinance
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit kBLD00-204
GENERAL CONDITIONS ,,.•,-~
1. Contractors working on this project are required to have a Labor & Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils'ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdawns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
A minimum of twenri-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
resid~tial project:
8. All building permits s=pire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal ~c approval prior to making changes in the field. ContaM the Building
Department @ 379-3208 prior to making changes to tbe approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2