HomeMy WebLinkAboutBLD00-203Watuman & Ketz Buildin8
187 Quinry Street, Suite 301
P«t Tow~enQ WA 98368
Photo: (360) 3793208 FaY: (360) 365-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD00-203 Issued: 10/19/00 Parcel Number. 989703903
Job Address: 1012 Water Street Zoning: C-III Type: V_N Occupancy: B
Nature of Work: Remodel commercial bathroom to comely with accessibility standards.
Owner: Mind Over Matter
Contractor: Discovery Bav Construction
Rob Gruye @ 360-301-4191
SEPARATE PERMITS REOUIItED:
Electrical -Contact Labor & Industries @ 360-4i7-2702
GENERAL CONDTITONS APPLY -SEE LAST PAGE
RF.C)TTTRF.n TN~PF('TT()N~
•
•
APPROVED/DATE
PLUMBING
Rough-in (D-W-V & clean outs)
Water supply
Pipe insulation
Pressure reduction valve if> 80psi
Barrier Free design required
MEC$ANCIAL
50 cfin source specific fan w/exhaust terminus 3'
from building openings
Fresh air via building openings
FRAMING (if applicable)
Wa11s
Fireblocking
DRYWALL (if applicable)
Walls
Ceiling
Call 48 hours before you dig for utility line locates
i-800-424-5555
Page 1 of 2
Pmnit N HLD00.2D3
FINAL
Property address posted w/ S" numbers
Fire Department signoff
Barrier Free Access
Plumbing
Mechanical
Final -Building
Il~ob/o~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut dawn while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, soddiag, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
•
3. All elements of engineering including nailing, holdowns, sheathing, and akernate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and s-I deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection an your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Fine! Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active
9. Revisions require submittal & approval prior to making changes in the. field. Contact the Building
Department (n~ 379-3208 prior to making changes to the approved plans.
10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2