Loading...
HomeMy WebLinkAboutBLD00-202Watcman ~ Katzauilding 181 Quincy Streel, Suite 301 Pat Towrnenq WA 98368 Phone: (360)379-3208 Fax: (360)383-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-LOL Issued: 10/17/00 Parcel Number: 948-312-701 Job Address: 1109 Hendricks Street Zoning: R=III Type: VV=N Occupancy: R_3 Nature of Work: Single-family Residential Roof Reaair• shingles sheathing. rafters, venting. insulation, drywall, etc. Owner: David and Julie McCulloch GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: , Electrical -Contact Labor & Industries @ 360-417-2702 • RF.(1TiTRFT) TN~PF.C'TTONS Contractor: Same as Owner APPROVED/DATE FRAMING - - - - - /©~ 51f~ ~~- R C Blocking Positive Connection Roof Venting INSULATION A~~1~0~ / :~ Fill exposed cavities Vapoc Bamer Paint DRY WALL NAILING Ceiling FINAL Vapor Barrier Paint Certificate Insulation Certificate (if applicable) Rouse Numbers -check for 5" numbers Smoke Detectors throughout; battery powered okay in existing construction Final -Building Ca1198 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemdt #BLiJ062/Y1 • 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plasticsheeting, etc. Soils shall be permanently stabilized with seeding, p{antings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and ovbrsee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works anoroval must be received prior to 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residentialproject. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department Q 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2