HomeMy WebLinkAboutBLD00-201Waterman R IC812 Building
i gi Quc,xy saes, s""' 3m
Port Townamq WA 98368
Phone: (360) 3793208 Fax: (360) 3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 Tor Inspection
Permit Number: BLDOO-2OI Issued: 10/16/00 Parcel Number: 988-800-903
Job Address: 632 Lincoln Street Zoning: RR_II Type: VV=N Occupancy: R_3
Nature of Work: Sinele-family Residential Interior Remodel
Owner: James Pivarnik Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
i
•
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING
Joists
Blocking
Positive Connections
Treated Wood to Concrete
PLUMBING
Rough-In (D-V-T & Clean outs)
~QI ~ 9/~
Water Supply
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
Seismic Restraint -strap @ 1/3 points
Pressure relief valve drain to exterior; elbow down, 6" -
24" above grade
FRAMING
walls ~a/ .~ ,
/~/~ (~
Window Ufactor - .40 or better
NFRC label shall be on windows & doors at time of Inspection
Window Safety Glazing
Air Seal
Door U-factor - .20 or better
Fire Blocking
Call 48 hours before you dig for utility tine locates
I-800-424-5555
Page 1 of 3
~~~~~
REQUIRED INSPF.CTinNS APPRnVF,TI/InATF.
INSULATION
Fill exposed cavities - ---- -- -----
DRY WALL NAILING
Walls
Ceiling
FINAL
House Numbers -check for 5" numbers
Plumbing
Smoke Detectors throughout; battery powered okay
in existing construction
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall .review and oversee correction of any and all deficiencies noted by required
inspeMions.
5. Re-inspection is required after inspection report correetions are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeeted. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
Call A8 hours before you dig Tor utility line locates
1-800-424-5555
Page 2 of 3
Pmni[ NBLD00.201
S. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3