Loading...
HomeMy WebLinkAboutBLD00-199 Walennan & Katz Boildv~g 181 Quinry Street. Swte 301 Part TowtuenQ WA 98368 Phone: (360) 379-3208 Fats: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMTT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-199 Issued: 10/31/00 Parcel Number: 989-708-603 Job Address: 1180 Jefferson Street Zoning: R~II Type: VV_N Occupancy: R-3 Total Occupant Load:2 Nature of Work: Construct detached ADU accessory to 420 Fillmore Street Owner: John R. Carey Contractor: TBD -See General Condition #1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 c DZ'l1T TTD Z,T TNCT)Tt !"TTl1NQ APPR(1VF.T)/nATE TEMP EROSION & SEDIMENT CONTROL Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks - ~ 7 f~'~~6 Footings Forms Reinforcement Interior Footings Porch/Deck Piers C „ ~, ' s ER , ~ - ~ - d ~ FOUNDATION Stem Wall ~/~~/~~ Forms ~" Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents - S required Crawl Space Access Engineered Holdowns Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pwmit # BLD00.199 REOUIItED INSPECTIONS APPROVED/DATE FLOOR FRAMING Girders (if applicable) Joists Blocking Shield under Posts Positive Connections Girder to Concrete Beam Pockets (if applicable) Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers ~~ ~y, /~ I /r PLUMBING: Rough-In (D-V-T & Clean outs) t Water Supply f t Ol ~ Water Hammer Arrestor at clothes and dishwasher rrh- G Gas Supply R D Hose Bibs (backflow protection required) Pipe Insulation (minimum R-3 sure .eduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection Whole House Fan -Bath Source Specific Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (min. R-4) and terminus (located 3' from opening) Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Pmnit M BLD00.199 RR(ITTTi2FTl TN.CPF.f TT(1NS APPROVED/DATE FRAMING e., ~, ~! a~ pn i r ~ (~~_q `r~ ~~iLe~ ~~~. ~uc~e. . Walls ' ngineered Shear YYalls --- 5 t ' t '~ ~. ! ,r a d~ ,,, -.-. [: r5 u I d n ~ C ~-t~? e.. ~ +'t rya ~e ~'~' N er v (r,tle-- ~; o,,,, Gu, ei mg Roof t-~' ~ , ~J' af' -to ~ , f . Rafter Positive Connection ~ ~ ~' ~ ~ ~-J °~ Attic Venting - @ ridge 0 Windows -escape - " Window safety glazi ~. "- ~ ~ r Q' ~, t_ in or - .40 or better NFRC window sticker must be on windows, doors Sb .,e~z Li,~w ~ ~ d skylights at inspection time __. __ Air Seal -"" Fresh Air Intake (Window Ports) ~ ~ ~?, ofJ Doors U-Factor -entry exempt ,~ ~ ~ jj ~ Fire Blocking p ~ t~, 7. 0 ° Weather Resistive Barrier , U INSULATION Floor (R=25) i l p ~ Walls (R=19) ~ ~ b {~- Ceiling (R=30) -o Baffles Vapor Bazrier: vapor barrier paint il bl k l 6 '~~~- ' ~ ~ Q ~~ C~ J~ po y m ac Crawl space - z I DRY WALL NAILING Walls Ceiling Enclosed space under stairs Gazage/House Occupancy Separation Interior Braced Wall Panels FINAL Fire Department Sign-Off (LPG) ~/~ Q'~~ ~ House Numbers - 5" / Plumbing ~ MechanicaUHeating Insulation Certificate Vapor Bamer Paint Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit M BLD00.199 C FNERAL. ('ONDiTiONC 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. ' 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-STTE WTTH THE APPROVED PLANS. Ca1148 hears before you dig for utility line locates 1-800-424-5555 Page 4 of 4