HomeMy WebLinkAboutBLD00-198Waterman & Katz Building
181 Quincy Sl, Suile 301
Port Townsend, WA98368
Phone (360) 379-3208 Fax: (360) 385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
TBTS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-198
Job Address: 1707 Water Street
Total Occupant Load: No Change
Owner: Bav Vista Condominium
Contractor: Seraphim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
72F!)T7TRRn TN.CPF.f`TTf1NC
PEDESTRIAN PROTECTION
Inspection required before beginning work
Provide protection per UBC as needed during
Constroction.
SEDIMENT CONTROL
Rights of way shall be kept free of dirt and debris and
swept as needed during construction.
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
INSULATION
Fill any exposed roof cavities.
FRAMING
Positive Connection
ROOF DRAINAGE
Drainage to be provided per UBC Section 1506
Issued: 10/13/00 Parcel Number: 931600006-007
Zoning: CII Occupancy: N/C Type: N/C
Nature of Work: Reulace existing roof over deck.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
Permit #BI.D00-198
FINAL
Building Numbers - 5" numbers of contrasting color
posted near main entrance of building and visible from
street per City Ordinance
Smoke Detectors as for new construction
(Battery Powered OK)
Final -Building
~,~~~~ ~.
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contraMor's
registration number and a Citv business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-ske and inspected
prior to beginning construction; cs11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced .wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspeMion report corrections are completed.
6. The Building Department is unable to pass final inspecion on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294.
7. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential projeM.
9. All buildmg permits ezpire if no progress bas been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
10. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Departmen4 Q 379-3208 prior to making changes to the approved plans.
11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2