Loading...
HomeMy WebLinkAboutBLD00-197Wafemm~&Katr Building IBl Quinry Street, Soite 301 Port Tawnaend, WA 98363 Phone: 360-379-5036 Fax 360J85-7675 • CITY OF PORT TOWNSEND li CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection GENERAL CONDITIONS APPLY: See last sage L' pI~i'~ SEPARATE PERMITS REOUHiED: ~x'{ Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 Permit Number: BLDOO-197 Issued: 12/01/00 Parcel Number: 963700013 Job Address: 121 Vista Boulevard Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 ~~~ Total Occupant Load: 5/2 Nature of Work: Construct Single-family Dwelling with garage G.C)v (c~ ~ ~ ~\ Owner: James and Nancy Finkbeiner Contractor: Terhune Homes, Inc. ~ 360-697-7000 / (t~ ~ l (} ~r~ RF.(1TTTRF.iI TNCPF("TTnNS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL Inspection required prior to footing work See General Condition #2 Per engineered plan Graveled construction entrance to prevent dirt and sediment from leaving the site FOOTINGS -refer to last page ojgeological engineer's letter dated 9/9/00 ~ ~/~!~/~ Setbacks / Footings Forms Reinforcement Interior Footings PorchlDeck Piers ~ ~~ i CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 L Building Permit #00-197 RE UIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts & Washers ` Vents -16 required vt ~ ~1 l Crawl Access Beam Pockets ~ ~- ~ ~"jj Engineered Holdowns FLOOR FRAMING NOTE: Engineered LPI floor plan on-site and available to the Inspector at inspection time . ~q Girders `~\ ~ Joists Blocking ,,~ r r G ~v- Positive Connection ` Girder to Concrete .Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) Water supply 3/q~0 ~ Water Hammer Arrestor Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Pemtil #00-199 U RF.(1TTTRF.11 TNSPF.f'TTf)NS APPROVED/DATE MECHANICAL -_ _- ~ ~ LPG Fireplace ~/p I Q Heat Pump - HSPF =h 6.8; COP =h 3.0 Ducts & duct insulation (supply and return air ducts R-8; supply ducts in conditioned space R-4) Whole house ventilation Integrated system 7" minimum smooth duct (8" min. flex) Automatic (electric) damper -certification from installer required at final Source Specific Exhaust Fans @ bathrooms (SOcfm), kitchen (100 cfrn) and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING /, j~ Walls j ~~/~ !~ /~ Engineered shear walls Engineered framing around openings/angle ties/straps /J~J ' Ceiling Joists ~~~0~ `/'~{ Roof -engineered truss plan to be on-site at time of Inspection Rafter/truss positive connection. Attic venting - 10.6 square feet Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - .65 or better NFRC sticker must be on windows at time of inspection Air Seal Fireblocking Weather Resistive Barrier CHIMNEY Termination INSTJLATION / Floor (R-19 required) ~~~/Q~ Walls (R-19 including garage/house common wall) Ceiling (R-30) Baffies Vapor Barrier -poly (floor) & vapor bamer paint 6 mil black poly in crawl space -seams lapped 12" Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pttmit N00.197 REQUIRED INSPECTIONS aPPRnvF'.n/naTi~' DRYWALL NAILING Walls Ceiling Gazage/House Occupancy Sepazation / /Z p Q , (_fc/ / `I~UI'/ DRAINAGE Engineered Plan FINAL Public Works Sign-off (,~~1 R ~~~ LPG- Fire Department Sign-off ~f l~ House Numbers 5" numbers Plumbing MechanicaUHeating Fresh air certification from installer Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -building GENERAL CONDITIONS • I. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion snd sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A Call 48 hour5before you dig for utility line locates I-800-424-5555 Page 4 of 5 Building Permit #00-197 minimum of twenty-four hours notice is required. Public Works approval must be received prior t_o scheduline the Buildine Department's final inspection. • 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours. before you dig for utility line locates 1-800-424-5555 Page 5 of 5 r