HomeMy WebLinkAboutBLD00-197Wafemm~&Katr Building
IBl Quinry Street, Soite 301
Port Tawnaend, WA 98363
Phone: 360-379-5036 Fax 360J85-7675
•
CITY OF PORT TOWNSEND
li CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
GENERAL CONDITIONS APPLY: See last sage L' pI~i'~
SEPARATE PERMITS REOUHiED: ~x'{
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
Permit Number: BLDOO-197 Issued: 12/01/00 Parcel Number: 963700013
Job Address: 121 Vista Boulevard Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 ~~~
Total Occupant Load: 5/2 Nature of Work: Construct Single-family Dwelling with garage G.C)v (c~
~ ~ ~\
Owner: James and Nancy Finkbeiner Contractor: Terhune Homes, Inc. ~
360-697-7000 / (t~ ~ l (} ~r~
RF.(1TTTRF.iI TNCPF("TTnNS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
Inspection required prior to footing work
See General Condition #2
Per engineered plan
Graveled construction entrance to prevent dirt and
sediment from leaving the site
FOOTINGS -refer to last page ojgeological
engineer's letter dated 9/9/00
~ ~/~!~/~
Setbacks /
Footings
Forms
Reinforcement
Interior Footings
PorchlDeck Piers
~ ~~ i
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
L
Building Permit #00-197
RE UIRED INSPECTIONS APPROVED/DATE
FOUNDATION
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers `
Vents -16 required vt
~ ~1 l
Crawl Access
Beam Pockets ~ ~-
~ ~"jj
Engineered Holdowns
FLOOR FRAMING
NOTE: Engineered LPI floor plan on-site and
available to the Inspector at inspection time . ~q
Girders
`~\
~
Joists
Blocking ,,~
r r
G ~v-
Positive Connection `
Girder to Concrete
.Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rough-In (D-V-T & Clean outs)
Water supply
3/q~0 ~
Water Hammer Arrestor
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Pemtil #00-199
U
RF.(1TTTRF.11 TNSPF.f'TTf)NS APPROVED/DATE
MECHANICAL -_ _- ~ ~
LPG Fireplace ~/p
I Q
Heat Pump - HSPF =h 6.8; COP =h 3.0
Ducts & duct insulation (supply and return air ducts
R-8; supply ducts in conditioned space R-4)
Whole house ventilation
Integrated system
7" minimum smooth duct (8" min. flex)
Automatic (electric) damper -certification from
installer required at final
Source Specific Exhaust Fans @ bathrooms (SOcfm),
kitchen (100 cfrn) and utility room (50 cfm)
Environmental air exhaust ducting (with backdraft
dampers), insulation (R-4) and terminus (3' from
openings into building)
FRAMING /, j~
Walls j ~~/~ !~
/~
Engineered shear walls
Engineered framing around openings/angle ties/straps /J~J
'
Ceiling Joists ~~~0~
`/'~{
Roof -engineered truss plan to be on-site at time of
Inspection
Rafter/truss positive connection.
Attic venting - 10.6 square feet
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - .65 or better
NFRC sticker must be on windows at time of inspection
Air Seal
Fireblocking
Weather Resistive Barrier
CHIMNEY
Termination
INSTJLATION /
Floor (R-19 required) ~~~/Q~
Walls (R-19 including garage/house common wall)
Ceiling (R-30)
Baffies
Vapor Barrier -poly (floor) & vapor bamer paint
6 mil black poly in crawl space -seams lapped 12"
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Pttmit N00.197
REQUIRED INSPECTIONS aPPRnvF'.n/naTi~'
DRYWALL NAILING
Walls
Ceiling
Gazage/House Occupancy Sepazation / /Z p Q ,
(_fc/ / `I~UI'/
DRAINAGE
Engineered Plan
FINAL
Public Works Sign-off
(,~~1 R ~~~
LPG- Fire Department Sign-off ~f l~
House Numbers 5" numbers
Plumbing
MechanicaUHeating
Fresh air certification from installer
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -building
GENERAL CONDITIONS •
I. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion snd sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing
and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free
of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
Call 48 hour5before you dig for utility line locates
I-800-424-5555
Page 4 of 5
Building Permit #00-197
minimum of twenty-four hours notice is required. Public Works approval must be received prior
t_o scheduline the Buildine Department's final inspection.
• 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours. before you dig for utility line locates
1-800-424-5555
Page 5 of 5
r