CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-196 Issued: 11/02/00 Parcel Number: 984-600-7011702
Job Address: 816 Taft Street Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load:N/C Nature of Work: SF Residential Addition: unheated ereenhouse/pottine space
Owner: Christopher Herold
Contractor: L. D. Richert
301-0543
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTTTRF.n TNSPF('TTONS
APPROVED/DATE
FOOTINGS
Setbacks
Forms
Reinforcement
Pier Footings
FLOOR FRAMING
Girders
Joists
Blocking
Post Base
Positive Connection Girder-to-Post
FRAMING:
Engineered Nailing for Ledger & Sheathing
Walls
Roof
Ceilings
Rafter Positive Connection
Weather Resistive Barrier
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
a~aa~re~i saiooaisc
FINAL
Smoke Detectors throughout existing constructionper ~ I~
1997 UBC; battery powered okay
House Numbers - 5" high
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-af way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pan
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspeMiom per year to keep
your building permit aMive.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 urior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.