Loading...
HomeMy WebLinkAboutBLD00-194way a„a xaa a~aa~ 1st Quinsy sued Suite Sot Pori Tow~end, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 • • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-194 Issued: 03115(01 Parcel Number: 984901703 Job Address: 472 K Street Zoning: RR^II Type: VV=N Occupancy: UU=1 Total Occupant Load: NA Nature of Work: Construct 216 sf utility shed/ not for human occupancy. Owner: Jens Coonenrath Contractor: Owner (385-0694) GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF,OiJIRF,D INSPECTIONS APPROVED/DATE FOUNDATION Wood foundation allowed on buildings less than 400sf Not used for human occupancy. Setbacks FRAMING: Walls Roof Ceilings Posts, beams & headers Windows -safety glazing Fire blocking Rafter Positive Connection Weather Resistive Barrier FINAL Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Su~ding Petmil #BLD00-194 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4, Owner or owner's agent shall review and oversee correction of any and alt deficiencies noted by required inspections. 5. Re-inspection isrequired after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-fourhours notice is required. Public Works approval must be received prior to scheduling the Building Department's fmal inspection. 7. Final Inspections and CertiLcate of Occupancy are required PRIOR to occupancy. 8. All building permits ezpire if na progress has been made within sia months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. L~ Ca1148 hours before yon dig for utility line locates 1-800-424-5555 Page 2 of 2