HomeMy WebLinkAboutBLD00-193Watmnan and ICa7z Building
I81 Quincy Street Suife 301
Part Townsend, WA 98368
• Phone (360) 3793208 Fix (360) 383-7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION STTE
Ca11385-2294 for Inspection
Permit Number: BLDOO-193 Issued: 10/09/00 Parcel Number: 989701003
Job Address: 110 Harrison Street Zoning: C-III(Historic) Type: VV=N Occupancy: M
Total Occupant Load: 30 Nature of Work: Tenant improvement of retail space
Owner: Dave Colbert Contractor: Owner
(301-1603)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTTS REQUIRED:
Electrical -Contact Labor & Industries Q 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
C~
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
Local, state and federal laws.
PLUMBING:
Rough-In (D-V-T & Clean Outs)
Water Supply
FRANIIlVG: ~,'f
~
Wa1 ~
~C
~ ~j )C
Positive connection at all post and post beam connections.
INSULATION
Fill all exposed cavities.
DRY WALL NAII.ING ~/ 3~~~
Walls
Ceiling
FINAL
House Numbers - 5" visible from street located at or near r „ ;~~
~ l 1 ! ~ .~CJi j (~/
front door
Final - Buildin
Ca1148 boors before you dig for utility line locates
1-800-424-5555
Page 1 of Z
Building Permit NBLD00.193
GENERAL CONDITIONS i
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a C~ business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including periling, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's-agent shall review and oversee correction of any and all deficiencies noted by
required inspections. `
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final"inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Bu~7ding Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits ezpire if no progress bas been made within sia months, or if no inspections are
done by the Building Department within one year. Call for at (east one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
DepaRment st 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLAN5.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2