HomeMy WebLinkAboutBLD00-191s- Wetmnan and Kea Hooding 181 Quincy Street Suite 301 Port Townsend WA 98368 Phone (360) 379-3208 Fax (360) 385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-191 Issued: 10/OS/00 Parcel Number: 931400202 Job Address: 601 Willow Street Zoning: R-11 Type: V=N Occupancy: R=3 Total Occupant Load: 5 Nature of Work: Remodel Single-family Dwelline Owner: Perry Soring/Janet Kearslev Contractor: Tollshark Construction (385-6334) (732-4080) GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOU]1tED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL Permit holder shall ensure that dirt & debris is not tracked onto Cityrights-of--way FOOTINGS Setbacks Slab Footings - @ greenhouse Interior Footings h j Ol ~O`C~D eet 3 of 4 Retaining Wall Footing -s ,-, Deck/Porch Footings Forms Reinforcement LIFER FOUNDATION Slab curb - (1) #4 bar ~L-~~-2~~n ~~~ ~/~ '~ -- Retaining Wall Forms Reinforcement Anchor Bolts Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Building Permit kBLD00-191 ~_-i REQUIRED INSPECTIONS APPROVED/DATE SLAB Reinforcement - #3 @ 2' o.c. each way @ greenhouse Insulation-R-10 under @ entry slab Hydronic Heat Tubing - @ entry FLOOR FRAMING Girders -new Versa-lam Joists Blocking Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers Hydronic Heat Tubing PLUMBING: (~ - Rough-In (D-V-T & Clean Outs) ~~~ ~/ y/Q( t Water Supply Gas Supply h l h d di h a A EX'C (oAs p! ~ 1? 7'AN ~ p rrester @ c ot es an s w s er Water Hammer d((1? ~ G„ ~ lX~ Hose Bibs (backflow protection required) Pipe Insulation - R-3 Pressure Reduction Valve if> 80 psi ~Y' C'ps C~pE ~~ Z ~bd Water Heater Seismic Restraint-strap @ 1/3 points 6A.+~-' (~`S~ Oft Pressure relief valve drain to exterior; Terminate 6" - 24" above ground MECHANICAL Boiler -manufacturer's installation instructions to be , % /Q /~,,J /)/) ~ on-site @ time of inspection; requires low water `/ ! `6/ (yl C.-( shut-off and high temperature shut-off Ducts & Duct Insulation -fresh air ducts in conditioned space: R-4 HRV 6"minimum smooth duct Balancing dampers on inlet and exhaust ducts Flow grids on supply and return ducts Source Specific Fans Environmental Air Exhaust ducting (wi backdraft dampers), insulation (R-4) and terminus (located 3' from opening) 'r Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit #BLD00.191 RF.OTiTRED INSPECTIONS APPROVED/DATE FILAMING: ~!, ,~ Walls /~~ ~~ / I / (l l Roof-Engineered truss plan to be on-site al ((~ ~ time of inspection Attic Venting -ridge & eave Ceilings Posts, beams & headers Windows -escape Windows -safety glazing (SGD) Windows Ufactor -see attached WATTSUN NFRC window sticker must be on Windows, skylights & doors at inspection time Skylights Air Seal Doors Ufactor -see WATTSUN Fireblocking Rafter/Truss Positive Connection Weather Resistive Barrier INSULATION Floor (R-19) ~ r ~l~l~ Wall (R-11/R-15) ` ~ Ceiling (R-38 attic/R19 vault) ~ (~{~G~t'/Y ~~~~ / Baffles ' Vapor Bamer: faced batts Crawl space - 6 mil black poly DRY WALL NAILING Walls /~~ ~ ,/ Ceiling / FINAL House Numbers - 5" high Plumbing Mechanical/Heating Insulation Certificate Smoke Detectors throughout; battery powered okay in existing construction Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #BLD00.191 ' v i GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after any corrections are completed. - 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 riot to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 4 of 4