Loading...
HomeMy WebLinkAboutBLD00-189Watamen R Katz Huilding 181 Winry Street, Suits 301 Port Towmend, WA 98368 Phase: (360)379-3208 Faz: (360)3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-1 g9 Issued: 10/18/00 Parcel Number: 101341005 Job Address: Fort Worden State Park Camoeround Comfort Station Zoning: P/OS Type: VV=N Occupancy: B Nature of Work: Install Public Toilet and Showers Owner: Washineton State Parks and Recreation Commission Contractor: TBD GENERAL CONDTITONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL Adjacent streets shall be swept daily or as required to prevent dirt and debris shall from being tracked onto street rights-of--way FQOTINGS -refer to Sheets 3, 6 & 8 Setbacks Footings Forms Reinforcement LIFER FOUNDATION -refer to Sheets 3 & 5-8 CMU Wall ~ 3 Z- ~ Forms l ~ ~ Reinforcement Anchor Bolts @ 24" o.c. Lintel Bond Beam Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 ~~~~ R~UIRED INSPECTIONS APPROVF,n/DATF, SLAB -refer to Sheet 6 Reinforcement PLUMBING Rough-in (D-W-V & clean outs) ~ / „ n /~'J Q ~ (,~ Water supply LPG supply Pipe insulation /~ ?~ ~ ~~.~. Q S ,~0~~ ~~~1 Pressure reduction valve if> 80psi (/ / , Hose bibs - backflow protection required Water heater Seismic restraint 2 places PR&T valve to exterior R-10 if electric placed on slab Barrier Free design required L LPG Heater specific fan w/ exhaust terminus 3' from building openings ~~ (~ Fresh air via building openings FRAMING Walls y Roof c~T Eng'd truss plan required at inspection Truss positive connection Attic Venting Attic access Posts, beams & headers Air seal Windows U-factor: see attached compliance Window Safety Glazing Doors U-factor:.60 or better Rafter/Truss Positive Connection Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 RE UIRED INSPECTIONS APPROVED/DATE ~~ a si.noooirv INSULATION Wall -cavities filled with perlite Ceiling R-38 Battles LIGHTING See Sheet 4 of 8 FINAL Property address posted w/ 5" numbers if telephone is located on premises Fire Department signoff Electrical signoff (L&I) Insulation certificate Vapor barrier paint certificate (if applicable) Barrier Free Access Plumbing MechanicaUlleating Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aaaroval must be received prior to scheduling the Building Department's final inspection. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 7 P~iaai.noootas 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-. residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes to the approved plans. ContaM the Building Department at 379-3208 prior to making changes in the field. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. CaU 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4