Loading...
HomeMy WebLinkAboutBLD00-186Waterman t Katz Building 181 Quincy Sweet, Suite 301 Port TowoaetW, Wq 98368 Phox:(360)379-3208 Fu: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION STTE Call 385-2294 for Inspection Permit Number: BLDOO-1g6 Issued: 10/06/00 Parcel Number: 958 200 409 Job Address: 2003 Kuhn Street Zoning: RR=II Type: V-N Total Occupant Load: 3 Occupancy: R-3 Nature of Work: Construct Sinele family residence Owner: Michael Barlev and Joanie Beldin Contractor: Same as Owner ****All elements of engineering including holdowns, framing, nailing and other engineered connections require inspection prior to cover**** GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTTRF.T) TNSPF.('.TTnNS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site -see SUD permit #00-034 GROUNDWORK PLUMBING Pressure Test ~/~ ~ Pipe Joints Exposed Pipe Bedding FOOTINGS Setbacks Footings ~ /Zl /~~ n /J ~!/ L/ (,_, f' Forms ( Reinforcement - (3) #4 Interior Footing Porch P' rs Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit#HLD00.186 REOiTIRED INSPECTIONS APPROVED/DATE _' FOUNDATION Stem Wall Forms n n ~ // O/ ( ~Z~ Reinforcement lam( G Anchor Bolts - @ 36 o.c. ` Engineered Holdowns SLAB Insulation Ja/~$/O t Radiant Floor Tubing FLOOR FRAMING NOTE: Engineered BCI floor joist plan to be on-site at time of inspection ~~ Joists Hydronic Tubing Blocking , Shield under Posts Positive Connections Treated Wood to Concrete Anchor Bolts and Washers PLUMBING: Rough-In (D-V-T & Clean outs) „n jj1,Ul~ E (,(/ S 7/2 3l o ( f` + (f - Water Supply ~ , ' Gas Supply Water Hammer Arrestor @ clothes and dishwasher Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground ME i er -instal atr`an instructions shall be on- ' at r~ i~ //~/~ time of inspection; requires low water shut-o,~'' 4 ~% 1 hut-o Whole House Fan -Upstairs Bath Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pmnit#BLD00-186 s RRCITITRF.T) TNSPF.CTTnNS APPROVED/DATE FRAMING: Walls -engineered panel walls Treated Wood to Concrete ~ ~~1~/~1 (/ Engineered Posts Beams & Headers Ceiling Roof . RafterlTruss Positive Connection -per engineering Roof Venting Windows -escape Windows -safety glazing Windows U-factor - .60 max. NFRC window sticker must be on windows and doors at inspection time Air Seal -Fresh Ai~- r Intake" ~ ow Port , rs --- Fire Blocking Weather Resistive Barrier INSULATION Radiant Slab (R=10 ) Walls (R-22 stress skin panel } Ceiling (R-30 stress skin ganel ) Vapor Barrier: paint WALL NAILING :~l u/! ~ ~~ O Walls ` l Ceiling , FINAL Public Works Sign-Off Fire Department Sign-Off (LPG) House Numbers Plumbing MechanicaUHeating Vapor Barrier Paint Certificate Smoke Detectors Final -Building ~ f ' y7 j f [~!~' i- r~ Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 3 of 4 Permit # BLD00-186 t (:FNF.RAT. CONDTTTONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active 4. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208} prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4