CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD00-185 Issued: 10/03/00 Parcel Number: 989700807
Job Address: Hastings Building: corner of Water and Tavlor Streets Zoning: C_HI
Occupancy: N/C Type: N/C Total Occupant Load: No Change
Nature of Work: Renair roof• remove existing built-ua roofing, realace sheathing and install new
torch-down roof covering
Owner: Hastings Estate Co.. Inc.
Contractor: All About Building
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,OTIIRED INSPECTIONS
APPROVED/DATE
PEDESTRLAN PROTECTION /~jf
2 ~~
Inspection required before beginning work l~
(:/
Provide protection per UBC as needed during
construction
SEDIMENT CONTROL
Rights of way shall be kept free of dirt and debris and
swept as needed during construction.
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
INSULATION
Fill exposed roof cavities
SHEATHING/NAILING ~ /~ ~
7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 r
`~
'/." staples @ 6" o.c. edges and field.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit gBLD00-I85
REQUIRED INSPECTIONS APPROVED/DATE
ROOF VENTING
Provide ventilation if current venting is inadequate to meet
code requirements
ROOFING
Install all roofing material per manufacturer's
~~~~CD-0
specifications and UBC Chapter 15
ROOF DRAINAGE.
Drainage to be provided per UBC Section 1506
FINAL /
Building Numbers - 5" numbers of contrasting color + ~~ ~ (~~
posted neaz main entrance of building and visible from ` ~
street per City Ordinance
Final -Building
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contraMor's
registration number and a City business license. Failure to provide proof of this documentation prior t~
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction,is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced. wall panels
(ABWP} require inspection prior to cover.
4. Owner or owner's .agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection cai1385-2294.
7. A minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Coil 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit NBLD00-185
8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
9. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
10. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
~~