Loading...
HomeMy WebLinkAboutBLD00-185Waterman & Katz Building 181 Quincy sl, Suite 301 Pat Townsend, W A 98368 Phone (360) 379-3208 Fax: (360) 385-7675 CJ CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD00-185 Issued: 10/03/00 Parcel Number: 989700807 Job Address: Hastings Building: corner of Water and Tavlor Streets Zoning: C_HI Occupancy: N/C Type: N/C Total Occupant Load: No Change Nature of Work: Renair roof• remove existing built-ua roofing, realace sheathing and install new torch-down roof covering Owner: Hastings Estate Co.. Inc. Contractor: All About Building GENERAL CONDITIONS APPLY -SEE LAST PAGE RF,OTIIRED INSPECTIONS APPROVED/DATE PEDESTRLAN PROTECTION /~jf 2 ~~ Inspection required before beginning work l~ (:/ Provide protection per UBC as needed during construction SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION Fill exposed roof cavities SHEATHING/NAILING ~ /~ ~ 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 r `~ '/." staples @ 6" o.c. edges and field. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit gBLD00-I85 REQUIRED INSPECTIONS APPROVED/DATE ROOF VENTING Provide ventilation if current venting is inadequate to meet code requirements ROOFING Install all roofing material per manufacturer's ~~~~CD-0 specifications and UBC Chapter 15 ROOF DRAINAGE. Drainage to be provided per UBC Section 1506 FINAL / Building Numbers - 5" numbers of contrasting color + ~~ ~ (~~ posted neaz main entrance of building and visible from ` ~ street per City Ordinance Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contraMor's registration number and a City business license. Failure to provide proof of this documentation prior t~ work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction,is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced. wall panels (ABWP} require inspection prior to cover. 4. Owner or owner's .agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection cai1385-2294. 7. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. Coil 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit NBLD00-185 8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 9. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 10. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 ~~ t