Loading...
HomeMy WebLinkAboutBLD00-184Wazerman & Katz Btrilditg ] 81 Quinry Sveet, Sude 301 Port Townutd, Wq 9$368 Pnone: (360)379-3zos Fax: (36o)3as-~6n CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-1 g4 Issued: 11/21/00 Parcel Number: 969907601 ~ ~~~~~~ Job Address: 414 Kearney Street Zoning : CC=II Type: V_N Occupancy: M °r (, ~ ~i~ Nature of Work: Remodel Existing Bowline Alley Building to Food Co-op Grocery Use of Building: Retail Total Occupant Load 267 Owner: Kev City Landing LLC (Bill Sperry) -//J~j~~ tir~~l~~ Contractor: Same as Owner (Job Site 379-33071 GENERAL CONDITIONS APPLY -SEE LAST PAGE ~~'~ ~~ S~a~6~ o,~ur 3~9~oi SEPARATE PERMITS REQUIRED: Lighting (permit revision) Street and Utility Development Permit Plumbing/Grease Trap Electrical Permit (See WA State Labor & Industries) Building Permit (Type I Kitchen Hood Shag & Suppression) Sign Outdoor Construction Activities shop be limited to 7: 00 AM- 6: DO PM, Monday - Fridrzy and prohibited on weekends and national holiday. All construction equipment shall be fitter/ with mufflers. REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in approved areas in accordance with local, state, and federal laws. ~p p'~rNG ~~ t2agw' l 2,/S/~Q (t D I 1 "\ PLUMBING -Barrier Free Standards Required See also permit #PLM00-009 , rr -- II D(w ~ Wj ~Z/y~l ~ D-W-V Rough in Island venting Floor drains-trap seal protection Water Supply Water Hammer Arresters Hose Bibs (backflow protection required) G ~.c~~c~ ~ - ~ rease Traps Condensate Drains .- cr~.. ~~y~~7 ~ ~f,~ Refrigeration Piping Hot water heater Seismic restraint PTR Valve Drain to exterior Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Prnnil# BLD00-184 RE UIRED INSPECTIONS APPROVED/DATE MECHANICAL ~'x~-r'. rods Pcp~ ~ ~1 ~i~c~f LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection 111.17 ~~~ g~~ ~/~~(~ ! ( HVAC Units Factory applied nameplate r {~,Qp~AN~ 7~uG ~~Z/ ~f ~Q; Manu's operating instructions attached 66 l Unit ID'ed for area served Access and work space for maintenance Disconnect Condensate drain MOTORS - NREC compliance NREC Temperature Zones Thermostat.Controls Deadband control Night Setback w/7 different day types Microprocessor controls w/heat indicators Dampers Duct Insulation & Sealing FRAMING Street & Utility Development Permit prior to ~J ~E~i~ /`gym 1 ~~~~ Framing Inspection All engineered elements require inspection prior to cover ' W ll ~jAG~. c~~ cr,C ~ ~R.em.7 a s p~~~~~ 7 „n //l ~i F-~-'r~S ~ iii Z-~G'.'v (`'! Roof t Roof Venting Roof Drains ~' ~ ~rr~/z pan ~u~~r,t.~ l/y ~'/ Windows l! Safety glazing .90 U-factor Opaque Doors - .60 U-factor Overhead Glazing - 1.45 U-factor Fire blocking Draft stop Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 l Pamil # • f~ RE UIRED INSPECTIONS APPROVED/DATE FRAMING -continued Air 5ea1 Weather resistive bamer INSULATION ~ /f •~ Z~~/0' X~/^' Slab (No insulation required/window trade-off) ~ Walls (not required; R-19 proposed) Roof (R-21 required) . ~ yy~~_ /~^ ~y~ ^ /\~~/lam /li' /~/ ~~~~ //t / VAPOR BARRIER (if applicable) DRYWALL NAILING Walls Ceiling SUSPENDED CEILING Frame and supports (Inspect prior to ceiling file installation) LIGHTING -revision required PARKING For inspection call John McDonagh 3 79-5085 • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 PemulB BLD00-784 REQUIRED INSPECTIONS APPROVED/DATE LANDSCAPING For Inspection call John McDonagh 379-5085 FINAL Plumbing Final /~ ('10~~ ~1~. ~,U,p ~55I0~ S~ ~ _ "- Barrier Free required d i Mechanical Final LPG `~/Z7~Oj WSVIAQ Certification letter req'd from installer stating compliance w/ "fresh air" requirements Fire Department Final Public Works Final Signoff Electrical Final (L& I) Jefferson County Health Dept. Final 'd miti ation er SEPA LUP98-031 Si noff for re / g p g q Call John McDonagh - 379-5085 / Final Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free otdirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. C~ Ca1148 hours before you dig Tor utility line locates i I-800-424-5555 Page 4 of 5 Pa.nilk BLD00-184 6. The Building Department is unable to pass fina- inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A • minimum of twenty four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. r1 L J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 .~