HomeMy WebLinkAboutBLD00-184Wazerman & Katz Btrilditg
] 81 Quinry Sveet, Sude 301
Port Townutd, Wq 9$368
Pnone: (360)379-3zos Fax: (36o)3as-~6n
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-1 g4 Issued: 11/21/00 Parcel Number: 969907601
~ ~~~~~~
Job Address: 414 Kearney Street Zoning : CC=II Type: V_N Occupancy: M °r (, ~ ~i~
Nature of Work: Remodel Existing Bowline Alley Building to Food Co-op Grocery
Use of Building: Retail Total Occupant Load 267
Owner: Kev City Landing LLC (Bill Sperry)
-//J~j~~ tir~~l~~
Contractor: Same as Owner (Job Site 379-33071
GENERAL CONDITIONS APPLY -SEE LAST PAGE ~~'~ ~~ S~a~6~
o,~ur 3~9~oi
SEPARATE PERMITS REQUIRED:
Lighting (permit revision) Street and Utility Development Permit
Plumbing/Grease Trap Electrical Permit (See WA State Labor & Industries)
Building Permit (Type I Kitchen Hood Shag & Suppression) Sign
Outdoor Construction Activities shop be limited to 7: 00 AM- 6: DO PM, Monday - Fridrzy and
prohibited on weekends and national holiday. All construction equipment shall be fitter/ with mufflers.
REQUIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in approved areas
in accordance with local, state, and federal laws. ~p p'~rNG ~~ t2agw'
l 2,/S/~Q (t D
I 1
"\
PLUMBING -Barrier Free Standards Required
See also permit #PLM00-009 , rr -- II
D(w ~ Wj ~Z/y~l ~
D-W-V Rough in
Island venting
Floor drains-trap seal protection
Water Supply
Water Hammer Arresters
Hose Bibs (backflow protection required)
G
~.c~~c~
~
- ~
rease Traps
Condensate Drains .-
cr~..
~~y~~7 ~ ~f,~
Refrigeration Piping
Hot water heater
Seismic restraint
PTR Valve Drain to exterior
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
Prnnil# BLD00-184
RE UIRED INSPECTIONS APPROVED/DATE
MECHANICAL
~'x~-r'. rods Pcp~ ~ ~1 ~i~c~f
LPG Stove -manufacturer's installation instructions
shall be on-site at time of inspection 111.17 ~~~ g~~ ~/~~(~
! (
HVAC Units
Factory applied nameplate r
{~,Qp~AN~ 7~uG ~~Z/ ~f ~Q;
Manu's operating instructions attached 66 l
Unit ID'ed for area served
Access and work space for maintenance
Disconnect
Condensate drain
MOTORS - NREC compliance
NREC Temperature Zones
Thermostat.Controls
Deadband control
Night Setback w/7 different day types
Microprocessor controls w/heat indicators
Dampers
Duct Insulation & Sealing
FRAMING
Street & Utility Development Permit prior to ~J
~E~i~ /`gym 1 ~~~~
Framing Inspection
All engineered elements require inspection prior to cover
'
W
ll
~jAG~. c~~ cr,C ~ ~R.em.7
a
s p~~~~~ 7 „n
//l
~i F-~-'r~S ~ iii Z-~G'.'v (`'!
Roof t
Roof Venting
Roof Drains
~' ~
~rr~/z pan ~u~~r,t.~ l/y ~'/
Windows l!
Safety glazing
.90 U-factor
Opaque Doors - .60 U-factor
Overhead Glazing - 1.45 U-factor
Fire blocking
Draft stop
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
l
Pamil #
•
f~
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING -continued
Air 5ea1
Weather resistive bamer
INSULATION ~
/f •~ Z~~/0'
X~/^'
Slab (No insulation required/window trade-off) ~
Walls (not required; R-19 proposed)
Roof (R-21 required)
. ~ yy~~_ /~^ ~y~ ^
/\~~/lam /li' /~/ ~~~~ //t
/
VAPOR BARRIER (if applicable)
DRYWALL NAILING
Walls
Ceiling
SUSPENDED CEILING
Frame and supports
(Inspect prior to ceiling file installation)
LIGHTING -revision required
PARKING
For inspection call John McDonagh
3 79-5085
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
PemulB BLD00-784
REQUIRED INSPECTIONS APPROVED/DATE
LANDSCAPING
For Inspection call John McDonagh
379-5085
FINAL
Plumbing Final /~
('10~~ ~1~. ~,U,p ~55I0~ S~
~
_ "-
Barrier Free required d
i
Mechanical Final
LPG
`~/Z7~Oj
WSVIAQ
Certification letter req'd from installer stating
compliance w/ "fresh air" requirements
Fire Department Final
Public Works Final Signoff
Electrical Final (L& I)
Jefferson County Health Dept. Final
'd miti
ation
er SEPA LUP98-031
Si
noff for re
/
g
p
g
q
Call John McDonagh - 379-5085 /
Final Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free otdirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
C~
Ca1148 hours before you dig Tor utility line locates i
I-800-424-5555
Page 4 of 5
Pa.nilk BLD00-184
6. The Building Department is unable to pass fina- inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
• minimum of twenty four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
r1
L J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 5 of 5
.~