Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-183
~J Waterman & Kali Building I81 Quinsy Street, Suite ]Ol Porl7owmend. WA 98368 Phone: 360-3795086 Fax 360J85-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE i Ca11385-2294 for Inspection Permit Number: BLDOO-183 Issued: 11!07/00 Parcel Number: 963700013 Job Address: 2901 Cleveland Street Zoning: RR=II Type: V_N Occupancy: R-3/U-1 Total Occupant Load: 6/2 Nature of Work: Construct Sinale-family Dwellin¢ with earaee Owner: Christoaher and Mareie Lvon Contractor: Same as Owner GENERAL CONDITIONS APPLY: See last aaee SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 DTi (1TTTDFTI TNCUF(`TT(1NC A PPR(1VFn/17ATF TEMP EROSION & SEDIMENT CONTROL Inspection required prior to footing work See General Condition #2 Silt Fencing as Needed Graveled construction entrance to prevent dirt and sediment from leaving the site FOOTINGS -refer to last page of geological engineer's letter dated 9/9/00 I ~ /li //©~ n - Setbacks J 11 ~ ` ~ (l/ Footings , Forms Reinforcement Interior Footings Porch/Deck Piers UFER CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page I of 4 Building Pertnii #00-183 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION CMLJ Stem Wa13 / Engineered Holdowns / ~ ~~ / Forms I Reinforcement Bond Beam Anchor Bolts & Washers Vents -18 required Crawl Access Beam Pockets ~.e,9~ ~~a ~~~~ ~, FLOOR FRAMING Joists ~~~ ~ ~ n /~ ( ~ ~ ~ Blocking `- ' ` J Shield under Posts Positive Connection Girder to Concrete Beam Pockets Treated Wood to Concrete Anchor Bolts & Washers PLUMBING Rough-In (D-V-T & Clean outs) /)r~ ~ Water supply ~l f~~l (X Water Hammer Arrestor Bibbs - backflow rotection required Pipe In lation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, to -ate 6" -24" above ground MECHANICAL Whole house ventilation r//~~~~ J Source Specific Exhaust Fans @ bathrooms (SOcfin), kitchen (100 cfm) and utility room (50 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 4 Building Permit #00-183 RE UIRED INSPECTIONS APPROVED/DATE FRAMING Walls Engineered shear walls ~~~ G~~~ Ceiling Joists Roof -engineered rafters Engineered Roof Sheathing Rafter/truss positive connection ~/~~ Attic venting -ridge and eave Engineered beams and headers Windows -escape Windows -safety glazing Window/Door U-factor - .32 or better NFRC sticker must be on windows and doors at time of inspection Air Seal ~ ? ~ d ~jJ Fireblocking ~ / ~ ~ L /// Weather Resistive Barrier ~ INSULATION Floor (R-30 required) //~~ ~~1t ~l/IL.., ~~~~ ~"" Walls (R-24 including garage/house common wall) r rvf Ceiling (R-38) Baffles Vapor Barrier - 4 mil poly 6 mil black poly in crawl space -seams lapped 12" DRYWALL NAILING ~/~~~~ /J~ C ~ Walls . Ceiling Interior Engineered Shear Panels Garage/House Occupancy Separation FINAL --- ----- -__~ _ Public Works Sien-off` ._. House Numbers - 5" numbers ^-"'--- Plumbing ~,~ ~ I~U~ (7~[ , Mechanical/Heating i ~~ ~' Insulation Certificate , a. l i t ~ ~~ Smoke Detectors _.. ~+inal -building .___,_ __.._ _-_._._ _ °--- - - -- ~. , . _.r_ _ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Pmnit #00-183 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspeMion report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection cat1385-2294, press 3. A minimum of twenty-tour hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildin¢ Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspeMions are done by the Building Department within one year. Ca11 for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CaI148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4