Loading...
HomeMy WebLinkAboutBLD00-180r~ C~ Building and Community Development W atenuan & Katz Building 181 Quinry Street Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 far Inspection Permit Number: BLDOO-18O Issued: 10/6ioo Parcel Number: 955900001 & -002 Owner/Contractor: Hamilton Heights LLC Installer: Kozeliskv's Home Services WAINS0626 Job Address: Lots 1 & 2 2456 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 5i2 Nature of Work: Set Manufactured Home w/ attached site-built garage/deck GENERAL CONDITIONS APPLY -SEE LAST PAGE _ SEPARATE PERMTTS REOUIItED: Electrical -Contact Labor & Industries @ 360-417-2702 ** *Hours of Construction are limited to 7:30 a m. to 6: 00 p. m. Monday through Friday and prohibited on weekends and national holidays*** APPROVED/DATE TEMP EROSION & SEDIl~IENT CONTROL See details attached to MIP and general condition #2 Silt Fence Drive Off Mat SLAB/CONCRETE Setbacks /~ l ~ 7 ,?/ C ~~ ' ~C Forms Monolithic Slab/Foundation (garage) Reinforcement Anchor Bolts Deck Piers Alt to Braced Wall Panel Holdown Hazdwaze ~~~ RE UIItED INSPECTIONS Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pmnit q S[.D00.180 REQUIRED INSPECTIONS FLOOR FRAMING (prior to skirting) Anchors 0 ~ /ln Steel Support Piers -Load-stamped and installed per 1 ~~ ~ (~ manufacturer's installation manual; clearance of 18"min. from lowest point of I-beam and the ground or footing for mirz of 75% of area under home w/ ]2"min. elsewhere unless installation manual specifres; otherwise area around home graded to provide runoff away from home PLUMBING: / / Water Supply -Main shut-off valve (port or ball valve) 1 / Z (,~'r installed in water supply piping prior to connection to home, min. 11 c '/ "diameter, same as supply pipe Pressure Reduction Valve if> 80 psi Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 ps.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. %."per foot MECHANICAL / /1 Ducts & Duct Insulation ~ CI 2/ m'( l~',{ Dryer Exhaust -vented to outside. Extension into crawl space ~ (( requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows FRAMING: Engineered roof truss plan to be on-site at time of inspection ~/~l Walls Alternate Braced Wall Panels Header Roof Garage/House Attachment DRY WALL NAILING ,yam GaragelHouse Occupancy Separation w/20 minute self-closing ~~ Z V / door • APPROVED/DATE Call 48 hours before you dig for utility line locates 1-800-4245555 Page 2 of 4 Pmnit # BLD00.180 RE UIRED INSPECTIONS APPROVED/DATE FINAL Public Works Sign-Off Electrical (L & I) Sign-Off ~ ~~~ House Number - 5" numbers / Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than '/. "allowed in skirting. Skirting to be rated for contact with earth if backf~ll is involved Crawl space ventilation per installation marmal @ 1 sq. ft./150 sq. ft. (I6 req'd.); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to all areas under home; minimum 18" x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, haldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after any corrections are completed. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Permit # BLD00-180 ' 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if na progress has been made within six months, or if no inspections are done by the Building Department within one year.-Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 4 of 4