HomeMy WebLinkAboutBLD00-180r~
C~
Building and Community Development
W atenuan & Katz Building
181 Quinry Street Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 far Inspection
Permit Number: BLDOO-18O Issued: 10/6ioo Parcel Number: 955900001 & -002
Owner/Contractor: Hamilton Heights LLC Installer: Kozeliskv's Home Services WAINS0626
Job Address: Lots 1 & 2 2456 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 5i2 Nature of Work: Set Manufactured Home w/ attached site-built garage/deck
GENERAL CONDITIONS APPLY -SEE LAST PAGE _
SEPARATE PERMTTS REOUIItED:
Electrical -Contact Labor & Industries @ 360-417-2702
** *Hours of Construction are limited to 7:30 a m. to 6: 00 p. m. Monday through
Friday and prohibited on weekends and national holidays***
APPROVED/DATE
TEMP EROSION & SEDIl~IENT CONTROL
See details attached to MIP and general condition #2
Silt Fence
Drive Off Mat
SLAB/CONCRETE
Setbacks /~ l ~ 7 ,?/
C ~~ ' ~C
Forms
Monolithic Slab/Foundation (garage)
Reinforcement
Anchor Bolts
Deck Piers
Alt to Braced Wall Panel Holdown Hazdwaze
~~~
RE UIItED INSPECTIONS
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Pmnit q S[.D00.180
REQUIRED INSPECTIONS
FLOOR FRAMING (prior to skirting)
Anchors 0
~
/ln
Steel Support Piers -Load-stamped and installed per 1
~~
~
(~
manufacturer's installation manual; clearance of 18"min. from
lowest point of I-beam and the ground or footing for mirz of 75%
of area under home w/ ]2"min. elsewhere unless installation
manual specifres; otherwise area around home graded to provide
runoff away from home
PLUMBING: /
/
Water Supply -Main shut-off valve (port or ball valve) 1 / Z
(,~'r
installed in water supply piping prior to connection to home, min. 11 c
'/ "diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 ps.i. for IS minutes
Pressure relief valve drain - to exterior of skirting, exhaust
downward between 6"and 24"above ground
Drainage Piping -sloped min. %."per foot
MECHANICAL / /1
Ducts & Duct Insulation ~
CI 2/ m'( l~',{
Dryer Exhaust -vented to outside. Extension into crawl space ~
((
requires venting through skirting with no dips; follow dryer
manufacturer's instructions; total combined length of ducting not
to exceed 14' w/ 2-90° elbows
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
~/~l
Walls
Alternate Braced Wall Panels
Header
Roof
Garage/House Attachment
DRY WALL NAILING ,yam
GaragelHouse Occupancy Separation w/20 minute self-closing ~~ Z
V /
door
•
APPROVED/DATE
Call 48 hours before you dig for utility line locates
1-800-4245555
Page 2 of 4
Pmnit # BLD00.180
RE UIRED INSPECTIONS APPROVED/DATE
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off ~ ~~~
House Number - 5" numbers /
Plumbing
Mechanical
Deck
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than '/. "allowed
in skirting. Skirting to be rated for contact with
earth if backf~ll is involved
Crawl space ventilation per installation
marmal @ 1 sq. ft./150 sq. ft. (I6 req'd.);
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum 18" x 24"
unless specified otherwise; covered with vinyl,
pressure-treated wood or metal.
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, haldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspeMion is required after any corrections are completed.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
Permit # BLD00-180 '
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if na progress has been made within six months, or if no inspections are
done by the Building Department within one year.-Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 4 of 4