HomeMy WebLinkAboutBLD00-179Waterman & KatzBuilding
181 Quincy Street, Suite 301
Pon Towruend, WA 98368
Plane: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 8 5-22 94 Tor Inspection
Permit Number: BLDOO-179 Issued: 9/26/00 Parcel Number: 930301101
Job Address: 516 V Street Zoning: RR=II Type: VV=N Occupancy: R_3
Nature of Work: Replace 12 windows and 3 sliding glass doors in bedroom, master bedroom, study.
living room, and bathrooms in existing rough openings
Owner: Frank and Beryl Williamson Contractor: Same as Owner
385-7650
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING/FINAL:
Windows -safety glazing where applicable per / /~
~ Z(~ ~ l ~U
~
attached details. `
Escape Windows -applicable in bedrooms if
enlazging existing window sizes
Window Ufactor - .40 or better (electric heat)
NFRC window sticker must be on
windows at inspection time
Air Seal
FINAL
Smoke Detectors throughout house per 1997
' ~f / ~j~/
Uniform Building Code; battery powered v/
smoke detectors adequate in existing
construction
House Numbers -check for 5" high
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Yrnnit #BLD00.179 .•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 3852294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with. mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to coven
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed. and inspected. For Public Works inspection ca113852294, press 3. A
minimum of twenty-four hours notice is reouired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building. permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for st least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10.. POST THIS. PERMIT ONSITE WITH THE APPROVED PLANS.
CaI148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2