Loading...
HomeMy WebLinkAboutBLD00-179Waterman & KatzBuilding 181 Quincy Street, Suite 301 Pon Towruend, WA 98368 Plane: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 8 5-22 94 Tor Inspection Permit Number: BLDOO-179 Issued: 9/26/00 Parcel Number: 930301101 Job Address: 516 V Street Zoning: RR=II Type: VV=N Occupancy: R_3 Nature of Work: Replace 12 windows and 3 sliding glass doors in bedroom, master bedroom, study. living room, and bathrooms in existing rough openings Owner: Frank and Beryl Williamson Contractor: Same as Owner 385-7650 GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE FRAMING/FINAL: Windows -safety glazing where applicable per / /~ ~ Z(~ ~ l ~U ~ attached details. ` Escape Windows -applicable in bedrooms if enlazging existing window sizes Window Ufactor - .40 or better (electric heat) NFRC window sticker must be on windows at inspection time Air Seal FINAL Smoke Detectors throughout house per 1997 ' ~f / ~j~/ Uniform Building Code; battery powered v/ smoke detectors adequate in existing construction House Numbers -check for 5" high Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Yrnnit #BLD00.179 .• GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 3852294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with. mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to coven 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed. and inspected. For Public Works inspection ca113852294, press 3. A minimum of twenty-four hours notice is reouired. Public Works approval must be received prior to scheduling the Building Department's final inspection. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building. permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for st least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10.. POST THIS. PERMIT ONSITE WITH THE APPROVED PLANS. CaI148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2