HomeMy WebLinkAboutBLD00-178Waterman & Kah BWldlns
151 Qui~uy Slrcet, SWte 301
Parl7awtwe0d, WA 95365
PM1owe 3603793205 Fu 3603817673
CITY OF PORT TOWNSEND
•
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-17g Issued: 9/25/00 Parcel Number: 985205803
Job Address: 2215 Cherry Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: N/C Nature of Work: Repair seMions of foundation with tontine/cripple wall
Owner: Pam Teaaarden
Contractor: Goldenbere Construction
385-6958
GENERAL CONDITIONS APPLY: See last Gage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be transported to the
Jefferson County Landfill or other approved location
in accordance with state and local laws and
ordinances
FOOTINGS ~ ~ /p
/~ ~~0~~
Setbacks
Footings ~
S ~ /~3/~
Forms v(
Reinforcement
Interior Footings (possible repair)
FOUNDATION
Cripple Wall Framing ~
Treated Wood to Concrete ~~~/
Blocking/Sheathing/Nailing
Reinforcement
Anchor Bolts & Washers
Crawl Access
Vents - 9 required
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Permit kti0-I78
REQUIRED INSPECTIONS APPRnVF:nmATF.
INSULATION
Floor (fill existing cavities )
6 mil black poly in crawl space; lap seams 12"
FINAL
House Numbers - check for 5" numbers
Smoke Detectors throughout -battery powered okay
rn existrng construction
Final -building
~I
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be
kept free of dirt debris. Soils eaposed during construction shall be temporarily stabilized with
matching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re•inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works agaroval must be
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Permit #00-178
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
' non-residential project.
8. All .building permits ezpire if no progress has been made within siz months, or if no inspecions
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval Qrior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3