Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-177
Watemun&KeK Bttildieg 181 Quinry $tfm.•. 3wle 301 Pmt Towmend. WA 98368 Plwnr (360) 379-3208 Fae: (360) 3817674 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-I77 Issued: 10!24100 Parcel Number: 101351001 Job Address: Building 532 Harbor Defense Wav Zoning: P/OS Type: V_N Occupancy: E-2/A-3 Total Occupant Load: 123 Nature of Work: Remodel Marine Science Center Dock Structure GENERAL CONDITIONS APPLY -SEE LAST PAGE Owner: Washington State Parks and Recreation Commission_ Peter Badame 385-5582 Contractor TBD SEPARATE PERMTTS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Fire Alarm -see Fire Department memo dated 10/14/00 REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All materials from demolition shall be reused per plans or transported to the Jefferson County Landfill or other approved location in accordance with all state and local laws and ordinances FLOOR FRAMING Joists -repair rotten joists in wet lab Blocking Positive Connection Treated Wood to Concrete PLUMBING Rough-In (D-W-V & clean outs) Water Supply Pipe Insulation Pressure Reduction Valve if> 80 psi Hose Bibs - backflow protection required Bamer Free Design Call 48 hours before you dig Tor utility line locates I-800-424-5555 Page 1 of 4 rode a stnoum REQUIRED INSPECTIONS APPRnVF.n/i1ATF. ,~ MECHANICAL Reinstall electric heaters Exhaust Fans - backdraft dampers, duct insulation, terminus 3' from openings NREC Temperature Zones Thermostat Controls Deadband Control Nght Setback w/ 7 day types Dampers Fresh air via building openings FRAMING NREC Section 1134 - "alternative requirements which will result in a reasonable degree of i " ~~-7- ~,4 t[,5~ ~~~r~- ~~~ energy effic ency walls ~ (Z-(I ~~ev Engineered plywood nailing Roof Ceilings -ACT (classroom) I (~ ~l ©.Q u ~L~L~~ ~ Z Ceilings - FRP (exhibit hall) l C Attic Access Posts, beams & headers -DF #1; see Sheet Sl - ,z/~7/~ ~~.~, ~,w ~'°"~"~ Windows -safety glazing Windows Ufactor - .47 proposed NFRC wiruiow sticker must be on windows at inspection time Doors '/:" threshold Lever hardware Door UFactor - .60 max Positive Connections Fire Blocking Air Seal Weather Resistive Barrier INSULATION ) _ (J~ _ ' ~ /~~ (NQ~`Y / Wall -fill exposed cavities ~ Ceiling -fill exposed cavities Baf3les Vapor Barrier required Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 2 of 4 r~~ a acpoum RE UIRED INSPECTIONS APPROVED/DATE • LIGHTING 2 Power Allowance -see Sheet 3 htin Li ~j~ ~ ~ ~~(7 ~ / . g g / ~ Lighting Controls per NREC 1513 Local Controls and Accessibility Area Controls Daylight Zones Display and Exhibition Lighting Automatic Shut-Off Controls (classroom) FINAL Fire Department sign-off Electrical sign-off (L.&I) 5" b /~ 77 ~/ g~ (/~~ ~4 9~v/ ers - Building num Plumbing Mechanical/Heating Insulation Certificate (if applicable) Vapor Barrier Paint Certificate (if applicable) Barrier Free (BF) Access Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept tree of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. Alt elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have-been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty tour hours notice is required Public Works approval must be received prior to scheduline the Buildine Department's final inspection. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 e~~ w stnoo-m 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. A11 building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. L_.J Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4