Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-176
wx~ a x,~ H~t~ tat puiay sue, swm Sot Pdt Townse~W, WA 98368 PAone: (360)3793208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE yyt~~ Call 385-2294 for Inspection Permit Number: BLLOO-1~IC) Issued: 10/25/00 Parcel Number: 101351001 Job Address: Buildine SOZ Harbor Defense Wav Zoning: P/OS Type: V^N Occupancy: E-2/A-3 Total Occupant Load: 88 Nature of Work: Remodel Marine Science Center Museum/Exhibits Structure Owner: Washineton State Parks and Recreation Commission Peter Badame 385-5582 GENERAL CONDTTIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702' Fire Alarm -see Fire Department memo dated 10/14/00 REQUIRED INSPECTIONS Contractor: TBD APPROVED/DATE DEMOLITION All. materials from demolition shall be reused per plans or transported to the Jefferson County Landfill or other approved location in accordance with all state and local laws and ordinances SLAB -refer to structural sheets Forms , //~ „/~~ ~/l 'T y CX~ Reinforcement Thickened Footing Post Footings @ canopy Post Bases PLUMBING -Barrier Free Design ReOuired 3~J1 C " `f Rough-In (D-W-V & clean outs) , ..~ Water Supply L Pipe Insulation ~ ~~'i~'S , ~ ~~ ~~ r 1~ Pressure Reduction Valve if> 80 psi / - Hose Bibs - backflow protection required ' Barrier Free Design Water Heater Seismic Restraint Pressure relief valve drain to exterior Ca11 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pami[ MBi.D00-176 RE UIRED INS ECTIONS APPROVED/DATE S MECHANICAL lit s S stem Heat Pum -manuf t ' p y p ac urer s f installation tnstructlons shall be on-site at time o ~ ~ ~ ~2 JD l b/ inspection ( Controls per NREC 1432 l Dampers Duct Insulation - R-8 in unconditioned space Duct connection joints substantially airtight FRAMING -all framing DF #1 NREC Section 1134 - "alternative requirements i~ ~ l ~yJ which will result in a reasonable degree of ~~ J ~l !i energy efficiency" G Walls. Roof Ceilings Attic Access Roof Venting Posts, beams & headers - DF #1 Treated Wood to Concrete Windows -safety glazing Skylights Doors ''/z" threshold Lever hardware Panic hardware Door UFactor - .60 max Engineered Connections Fire Blocking Air Seal Weather Resistive Barrier INSULATION Wall-R-19 ~ /l~©/ Il Ceiling - acoustic/existing Baffles Vapor Barrier required -paint DRYWALL NAILING Walls /~"" n ,~ tyI s~®' t J/ " Ceiling ( Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pamil tl BLD0Q176 uF.nllluF.n TN4PFC'TTnN~ APPROVED/DATE i i LIGHTING Exterior Lighting Power Allowance -see Sheet 3.1 ~~///j~J Interior Lighting Power Allowance -see Sheet 3.1 l~/ (J~ Lighting Controls per NREC 1513 Local Controls and Accessibility Area Controls Daylight Zones Display and Exhibition Lighting Automatic Shut-Off Controls (classroom) FINAL Fire Department sign-off (~////~n// Electrical sign-off (L&I) 7 ~/ Building numbers - 5" Plumbing MechanicaVHeating Insulation Certificate (if applicable) Vapor Barrier Paint Certificate (if applicable} Fresh Air Certification Letter from I3VAC Contractor Bamer Free (BF) Access Exit Signage Exit Illumination Occupant Load Posted Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way sha[I be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels {ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 ra,„nxa~,noans t 5. Re-inspection is required after inspection report corrections are completed. ~' 6. The Building Department is unable to pass final inspection on your project until Public Works 1 requirements have been completed and inspeMed. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9, Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4