Loading...
HomeMy WebLinkAboutBLD00-175Waterman & Katz Building 181 Quinry St, Suile 301 Port Townsend, W A 98368 Phofce (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-175 Issued: 9/14100 Parcel Number: 958202601 Job Address: 310 24'" Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: No Chance Nature of Work: Remove existing wood shingle roof. install new sheeting and asuhalt shingle roof. Owners: Ken & Sandv Melheim Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RF,(ITTTRF,D TNSPF.C'TTONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING 7/16" OSB requires 8d @ 6" o.c. edges & / 9/( 9 ~ (fJ 12" field or 1 3/4" staples @ 6" o.c. edges and field, minimum. ROOF VENTING Ridge and gable end FINAL - House Numbers - 5" minimum / ~~~~ numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance -Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLD00-175 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished.. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construMion is complete. Applicant is responsible for protection of adjacent properties. 3. AlI elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspeMion is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press?. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Buildine DeoartmenPs final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 2