CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-175 Issued: 9/14100 Parcel Number: 958202601
Job Address: 310 24'" Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: No Chance Nature of Work: Remove existing wood shingle roof.
install new sheeting and asuhalt shingle roof.
Owners: Ken & Sandv Melheim Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,(ITTTRF,D TNSPF.C'TTONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in
Jefferson County Landfill or other location in
accordance with all local, state and federal
laws.
SHEATHING
7/16" OSB requires 8d @ 6" o.c. edges & /
9/( 9 ~ (fJ
12" field or 1 3/4" staples @ 6" o.c. edges and
field, minimum.
ROOF VENTING
Ridge and gable end
FINAL
- House Numbers - 5" minimum / ~~~~
numbers of contrasting color posted near
main entrance of house and visible from
street per City Ordinance
-Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLD00-175
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished..
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; caI1385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils ezposed during construMion shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construMion is complete. Applicant is responsible for protection of adjacent properties.
3. AlI elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspeMion is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press?.
A minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Buildine DeoartmenPs final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2