Loading...
HomeMy WebLinkAboutBLD00-173i • Waterman .@ Katz Building 181 Quincy St, Suite 301 Port Townxnd, WA 98368 Phone (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD00-173 Issued: 9/13/00 Parcel Number: 990000101 Job Address: 1120 Lawrence Street Zoning: CC^III Type: VV=N Occupancy: AA=3 Total Occupant Load: No Chance Nature of Work: Remove existing asphalt shingle roof, replace sheathing and install similar color asphalt shingle roof and install torchdown on flat Hart of roof. Visible roofing to be 3-tab grey. non-architectural riae, (i.e. flat, 3-tabl. Owner: Richard Wilev (Uatown Theatre) Contractor: Peninsula Roofing GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE PEDESTRIAN PROTECTION Inspection required before beginning work _/ ~~js/ -Provide protection per UBC (see attached). - Signage shall be installed at the intersections of Polk and Fillmore Streets directing pedestrians to cross Lawrence at approved crosswalks due to sidewalk closure ahead. - All construction work shall cease and blocked sidewalk and parking closure shall be removed daily during normal theatre operating hours if theatre remains open during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit #BLI~i)0-d73 SEDL~NT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction SHEATHING/NAILING l / g`~ j ~ 7/16" OSB requires 8d @ 6" o. c. edges & 9/ r `~ ~ 12" field or 1 '/1' staples @ 6" o.c. edges and I field. ROOF VENTING If ridge and eave or soffit venting is provided, then net free ventilation area shall not be less than 1 square foot per 300 square feet. of the azea of the space ventilated. Openings shall be covered with corrosion resistant'/a" mesh. ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter 15. FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance. Final -Building J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permit #BLD00-173 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. 7. A minimum of twenty-four hours notice is required. Public Works aouroval must be received prior to scheduling the Building Deaartment's final inspection. 8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 9. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Cal- for at least one inspection per year to keep your building permit active. 10. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 i I ~II J