HomeMy WebLinkAboutBLD00-173i
•
Waterman .@ Katz Building
181 Quincy St, Suite 301
Port Townxnd, WA 98368
Phone (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD00-173 Issued: 9/13/00 Parcel Number: 990000101
Job Address: 1120 Lawrence Street Zoning: CC^III Type: VV=N
Occupancy: AA=3 Total Occupant Load: No Chance
Nature of Work: Remove existing asphalt shingle roof, replace sheathing and install similar color
asphalt shingle roof and install torchdown on flat Hart of roof. Visible roofing to be 3-tab grey.
non-architectural riae, (i.e. flat, 3-tabl.
Owner: Richard Wilev (Uatown Theatre) Contractor: Peninsula Roofing
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS APPROVED/DATE
PEDESTRIAN PROTECTION
Inspection required before beginning work _/
~~js/
-Provide protection per UBC (see
attached).
- Signage shall be installed at the
intersections of Polk and Fillmore Streets
directing pedestrians to cross Lawrence at
approved crosswalks due to sidewalk closure
ahead.
- All construction work shall cease and
blocked sidewalk and parking closure shall
be removed daily during normal theatre
operating hours if theatre remains open
during construction.
DEMOLITION
All construction debris to be deposited in
Jefferson County Landfill or other location in
accordance with all local, state and federal
laws.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit #BLI~i)0-d73
SEDL~NT CONTROL
Rights of way shall be kept free of dirt and
debris and swept as needed during
construction
SHEATHING/NAILING l / g`~
j
~
7/16" OSB requires 8d @ 6" o. c. edges & 9/ r `~
~
12" field or 1 '/1' staples @ 6" o.c. edges and I
field.
ROOF VENTING
If ridge and eave or soffit venting is
provided, then net free ventilation area shall
not be less than 1 square foot per 300 square
feet. of the azea of the space ventilated.
Openings shall be covered with corrosion
resistant'/a" mesh.
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15.
FINAL
Building Numbers - 5" numbers of
contrasting color posted near main entrance
of building and visible from street per City
Ordinance.
Final -Building
J
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit #BLD00-173
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
7. A minimum of twenty-four hours notice is required. Public Works aouroval must be received prior to
scheduling the Building Deaartment's final inspection.
8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
9. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Cal- for at least one inspection per year to keep your
building permit active.
10. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
i
I ~II
J