HomeMy WebLinkAboutBLD00-172Waterman & Kati auil6ing
181 Quincy Slreef. Sulte 301
Port rownrend. WA 9tU6B
Phone: Jb0-3793208 Pax 360383-7675
u
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLDOO-172 Issued: 9120/00 Parcel Number: 957900906
Job Address: 1599 Hastines Avenue Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: 3 Nature of Work: Set New Manufactured Home
Owner: Leah Thomas
Contractor: Nu Trend Enterprises, inc. WAINS0246
****Installer: See Attached Installer Tag****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF,(1TTTRF.n TNSPF,CTTnNS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See general condition #2 and attached details with
Street Development Permit #00-049
Silt Fence as needed
Drive OffMat to prevent sediment from leaving
the site
FOOTINGS/SLAB ~ f /~ ~ %~_ ~~ '
/
Setbacks
Forms (
Reinforcement
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed
j Z~~ 7il ~D
per manufacturer's installation manual; clearance
of 18"min. from lowest point ofl--beam and the
ground or footingfor min. of 75% of area under
home w/ 12 "min. elsewhere unless installation
manual specifies; otherwise area around home
graded to provide runoff away from home
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page I of 3
Permit #BLD00.177
REQUIRED INSPECTIONS APPROVED/DATE
PLUMBING: C
)
Water Suppty -Main shut-o,~'valve (port
r ball valve)
installed i» water supply piping prior to connection to
home, min. '/, "diameter, same as supply pipe
Pressure Reduction Valve if> 80 psi
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 ps. i. for I S minutes
Pressure relief valve drain - to exterior of skirting,
exhaust downward between 6"and 24"above ground
Drainage Piping -sloped min. %.' per foot
MECHANICAL ~ )
Ducts & Duct Insulation ~ ~ l Zl D ~
Dryer Exhaust -vented to outside. Extension into crawl
space requires venting through skirting with no dips;
follow dryer manufacturer's instructions; total combined
length of ducting not to exceed ]4' w/ 2-90° elbows
FRAMING:
Entry Porch/Decks
VAPOR BARRIER
6 mil black poly ground cover (not required where area
under home is concrete slab floor with a minimum
thickness of 3-% inches)
FINAL
Public Works Sign-Off
Electrical (L & n Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Final -Building
No holes or gaps greater than'/."allowed in skirting.
Crawl space ventilation per installation mamral
I/ISD (Il req'd); located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to all areas
under home; minimum ]8"x 24"; covered with vinyl,
pressure treated wood or metal.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 3
Permit#BLD00.172
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All huilding permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions. require review and approval prior to making changes in.the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
f