HomeMy WebLinkAboutBLD00-171
- Waterman & Katz Building
181 Quincy St., Suite 301
Port Townsend, WA98368
Phone (360) 3793708 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-171 Issued: 917100 Parcel Number: 989713101
Job Address: 607 Van Buren Zoning: RR^II Type: V'N Occupancy: RR_3
Total Occupant Load: No Chance Nature of Work: Remove eaisting wood shingle roof,
and install asphalt shingle roof.
Owner: Serifina Gunter Contractor: Hone Roofing (385-5653)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPRO VED/DATE
DEMOLITION
All construction debris to be deposited in
Jefferson County Landfill or other location in
accordance with all local, state and federal
laws.
SHEATHING
'/z" CDX requires 1-3/4" staples @ 6" o.c.
edges and field, minimum.
ROOF VENTING
Ridge and cave
FINAL
House Numbers - 5" numbers of contrasting
color posted near main entrance of house and
visible from street per City Ordinance
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLDOOd7~i
GENERAL CONDITIONS ~'
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils ezposed during construMiop shall be temporarily stabilized with mulching,.
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once.
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pahels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any apd all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
A minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
. residential project.
8. All building permits ezpire if no progress has been made within siz months, ar if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2