CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD00-170 Issued: 9111/00 Parcel Number: 988800306
Job Address: 739 Lincoln Street Zoning: R_II Type: V-N Occupancy: R_3
Nature of Work: Replace double hung single alane wood windows with same size vinyl windows,
using existing wood frames.
Owners: Harold & Julia Bennett Contractor: Owner
(360)385-9278
GENERAL CONDITTONS APPLY -SEE LAST PAGE
FRAMING/FINAL:
Windows -safety glazing where applicable per
attached details.
Egress Windows
Window Ufactor - .40 or better (electric heat)
NFRC window sticker must be on
windows at inspection time
Air Seal
House Number -minimum 5" per Port Townsend
Municipal Code 12.16,050
Smoke Detectors throughout; battery powered
smoke detectors adequate in existing
construction
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Perini[ MBLD00-I90
GENERAL CONDITIONS a
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job sfiut down while this is accomplished.
2. Temporary erosion and sediment control (TE5C) measures shall be installed on-site and inspected prior
to beginning construMion; ta11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. A11 elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to coven
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
.inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenri-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Building Department's final inspection.
Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within sin months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit aMive.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department Q 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.