Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
BLD00-168
Wa4mian & Kmz Btilding 181 Quinry Stael, Slim 301 )'oM1 Townsend. WA 98368 Plwx: (360) 379-3208 Faz: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-168 Issued: 9112100 Parcel Number: 948309902 Job Address: 1010 Sheridan Avenue Zoning: CII-H Type: V-N Occupancy: B Nature of Work: Foundation wall and exterior bearine wall rep air resulting from automobile impact Owner: Madrona Medical Clinic - 385-5388 (Sandy) Contractor: Little and Little Construction 385-5606 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTTRF,T) TN~PF.C'TiONS APPROVED/DATE FOUNDATION Stem Wall Forms Holdown Anchor 1Zod/HD 14A -also refer to holdown schedule from original plans Anchor Bolts and Washers FRAMING ' 5/4~ ~1' Walls -see engineering and shear wall schedule ~ ~~ `. Nailing -see engineering and shear wall schedule INSULATION r ~ ~~©~ Fill exposed cavities per original plan ~ DRY WALL NAILING ~ ~~~ ~ i`/ l~ Walls Ceiling FINAL ~ ~/~ Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pmrtut NBLpOp-168 ENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures sha116e installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall 6e kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A J ~~~~~ ~~ 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for st least one inspection per year to keep your building permit active. 9. Revisions .require submittal & approval prior to making changes in the field. Contact the Building Department ®379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2