CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT &
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-166 Issued: 9/6/00 Parcel Number: 992300012
Job Address: 4438 Lopez Avenue Zoning: R-II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chanee Nature of Work: Construct decks (416 sg. ft.)
Owner: Steven Emerv Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
~~
•
RE UIRED INSPECTIONS
RECORD
APPROVED/DATE
CONCRETE
Setbacks
Footings/Deck Piers
FLOOR FRAMING/DECK
NOTE: All framing members shell be pressure treated or
`~f
~
~O~ ~
wood of natural resistance to decay / C
'
Posts 111
Beams -see span notes on plans
Joists
Positive Connection
Post-to-Pier
Post-to-Beam
Treated Wood Exposed to Weather
Lag Bolts (a3 ledger.
Blocking
FINAL
House Numbers posted (min. 5'~ p~ // ,, n
~t/~~Yl/UU l'~
Guardrails
Landings
Stairs
Handrails
Smoke Detectors throughout existing house per 1997 UBC -
one in each sleeping room and in each area leading to
sleeping rooms with minimum one on each floor
Deck -Final
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Permit %BLD00•I66
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. -Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum oftwenty-four hours notice is required. Public Works aoaroval must be received nrior to
scheduline the Building Department's 6na1 inspection.
7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspeMions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.