Loading...
HomeMy WebLinkAboutBLD00-166Welaman R KaK 1 Bt Quinry Sheet Sbk 301 Pal Towmeend. WA %368 P1wne (360) 379.3108 Fix (360) 385.7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-166 Issued: 9/6/00 Parcel Number: 992300012 Job Address: 4438 Lopez Avenue Zoning: R-II Type: VV=N Occupancy: R-3 Total Occupant Load: No Chanee Nature of Work: Construct decks (416 sg. ft.) Owner: Steven Emerv Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE ~~ • RE UIRED INSPECTIONS RECORD APPROVED/DATE CONCRETE Setbacks Footings/Deck Piers FLOOR FRAMING/DECK NOTE: All framing members shell be pressure treated or `~f ~ ~O~ ~ wood of natural resistance to decay / C ' Posts 111 Beams -see span notes on plans Joists Positive Connection Post-to-Pier Post-to-Beam Treated Wood Exposed to Weather Lag Bolts (a3 ledger. Blocking FINAL House Numbers posted (min. 5'~ p~ // ,, n ~t/~~Yl/UU l'~ Guardrails Landings Stairs Handrails Smoke Detectors throughout existing house per 1997 UBC - one in each sleeping room and in each area leading to sleeping rooms with minimum one on each floor Deck -Final Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Permit %BLD00•I66 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspeMed prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. -Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum oftwenty-four hours notice is required. Public Works aoaroval must be received nrior to scheduline the Building Department's 6na1 inspection. 7. Final InspeMions are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspeMions are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2