HomeMy WebLinkAboutBLD00-165Waterman & Katz Buildivg
I81 Quincy Street, Suite 301
Port TowruenQ WA 98368
Phoro: (360)379-3208 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-165 Issued: 8/31/00 Parcel Number: 957307905
Job Address: 1924 Jefferson Street Zoning: RR=I Type: V_N Occupancy: RR=3
Nature of Work: Realace all windows except front bay window with same size double-Wane vinyl
windows.
Owner: Barbara Dorgan
(360) 344-3801
Contractor: Graves & Co. Inc.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RFf1TTTRFTT TNCPF('TinN~
•
J
APPROVED/DATE
FRAMING/FINAL:
Windows -safety glazing where applicable per
attached details..
Escape Windows -applicable in bedrooms if
enlarging existing window sizes
Window Ufactor - .65 or better (propane heat)
NFRC window sticker must be on
windows at inspection time
Air Seal
FINAL
Smoke Detectors throughout; battery powered ^ /~ ~j~ /~~
(~
/ ~" (~
Smoke Detectors adequate in existing `
construction
House Numbers -min. 5" high
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemut RBLD00-165
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-af--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, p-astic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3: A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
schedulin¢ the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within sia months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department (a3 379-3208 prior to making,changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page Z of 2