Loading...
HomeMy WebLinkAboutBLD00-163Watesmen ffi Kqz Building 1 el Quin<y Stred, Suite 301 Pal7owna~d, WA98366 Plwnc: (360) 379-31A6 Fu: (360) 365.7615 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-163 Issued: 12/28/00 Parcel Number: 989800049 Job Address: 751 Commerce Loon Zoning: PTBP PUD Type: V_N Occupancy: FF=1 Occupant Load: 21 Nature of Work: Construct Manufacturing Building Owner: Port Townsend Business Park. LLC Contractor; F.P.H. Construction. Inc. ~ ~ f ~ ', c/o 1" Western Development Bob Mathwig 360-731-381 ~ !'~ ( , s ., ~ ~ GENERAL CONDTTIONS APPLY -SEE LAST PAGE / " ' "', 7~ SEPARATE PERMTI'S REOUIItED: ~ ~~~ '~-' I~ Electrical -See Labor & Industries *'~**Hours o1'construction are limited to 7 a.m. to t5 p. m. Mondav through Friday and prohibited on weekends and national ho[idays**'~* REQUIRED INSPECTIONS • APPROVED/DATE TEMP EROSION & SDM'T CONTROL See General Condition #2 -inspection required prior to foundation work FOOTINGS Setbacks //~~~~q.J Footings l/ ~ 1 Forms l Reinfor ement ~~ FOUNDATION -per engineering R-10 rigid @ perimeter - 24" vertical „~ ~~ ~~~ ~` ~- ~ _ Stem Wall Forms Reinforcement Anchor Bolts - 5/8" with 2" x 2" x 3/16" washers Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 5 Permit # BLD00-163 ' REQUIRED INSPECTIONS PLUMBING -Barrier Free design required Rough-in (D-W-V & clean outs) _, Q (~ 3(/ Water supply D~ ~ u3~d'V'~ l( LPG supply Pipe insulation Pressure reduction valve if > SOpsi Hose bibs - backflow protection required Water heater Seismic restraint 2 places PR&T valve drain to exterior R-10 if electric placed on slab MECHANC><AL LPG forced air furnace w/ ductwork Combustion air 3/9~oi Venting Heat source equipment & controls Factory applied nameplate Manu's operating instructions attached Unit identified for area served Access and work space for maintenance Disconnect Condensate drain to approved location NREC temperature zones Thermostat controls Deadband control Nght setback w/7 different day types Dampers Ducting & duct insulation R-7: supply & return in enclosed ceiling space R-3.3: supply & return in conditioned space w/air temperature <55 or>I05 Source specific fan w/exhaust terminus 3' from building openings (bath fans) Fresh air via building openings APPROVED/DATE '~ J Ca1148 hours before you dig for utility line locates i-800-424-5555 Page 2 of 5 RF.OiTiRF.D INSPECTIONS APPROVED/DATE Peretit#BLD00-163 FRAMING -Minor Improvement Permit approval required prior to final Walls 2~ n~~ ~n J `~ - y J/ Weather resistive barrier ~ Engineered shear walls Front & rear walls nailing: 7/16" plywood w/8d @ 6" o.c. edges, 12" o.c. field Roof Eng'd truss plan required at inspection Truss positive connection Attic Draft stop per 3000SF of attic space Venting Attic access Posts, beams & headers Fireblocking @ 10' o.c. horz. & vert. Air seal Windows - U-factor:.90 max. NFRC window sticker must be on windows at inspection time Doors - U-factor:.60 (includes roll-ups) CMU FAtrADE @ CORNERS (brick) Wall ties 22 gage x'/." 24" o.c. w/hook engaging horizontal joint reinforcement wire (9 B.W. gage) Stud spacing 2x4 @ 16" o.c. & 2x6 @ 24" o.c. max. Approved paper over sheathing INSULATION ~ /O (~~ ~y fl~ ~ ~ ! ` Wall R-11 Ceiling R-30 Ballles VAPOR BARRIER Paint, kraft paper or 4 mil visqueen DRYWALL NAILING `~" ~ 3/D1 Walls Ceiling LIGHTING See approved plans and NREC lighting summary Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Pamil # BLD00.163 ~ REQUIRED INSPECTIONS APPRnVED/DATF. PARKING call John McDonagh @ BCD, 379-5085, for inspection I Barrier Free Van Accessible space required - ----- - ----- LANDSCAPING -plan to be submitted for review and approval; landscaping installed prior to final inspection Per PTJD; call John McDonagh @ BCD, 379-5085 for inspection FINAL Property address posted w/ 5" numbers Fire Department signoff Public Works signoff Electrical signoff (L&I) Insulation certificate Vapor barrier paint certificate (if applicable) Barrier Free Access Plumbing MechanicaUHeating Exits Signs & Illumination Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for proteMion. of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Call 48 hours before you dig for utility line locates I-800.424-5555 Page 4 of 5 Yemtit # BLD00-163 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non• residential project. A Temporary Certificate of Occupancy (TCO) request requires minimum 72 hours notice. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 t u