Permit Number: BLDOO-163 Issued: 12/28/00 Parcel Number: 989800049
Job Address: 751 Commerce Loon Zoning: PTBP PUD Type: V_N
Occupancy: FF=1 Occupant Load: 21
Nature of Work: Construct Manufacturing Building
Owner: Port Townsend Business Park. LLC Contractor; F.P.H. Construction. Inc. ~ ~ f ~ ',
c/o 1" Western Development Bob Mathwig 360-731-381 ~ !'~ ( ,
s ., ~ ~
GENERAL CONDTTIONS APPLY -SEE LAST PAGE / " ' "', 7~
SEPARATE PERMTI'S REOUIItED: ~ ~~~ '~-' I~
Electrical -See Labor & Industries
*'~**Hours o1'construction are limited to 7 a.m. to t5 p. m. Mondav through Friday and
prohibited on weekends and national ho[idays**'~*
REQUIRED INSPECTIONS
•
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition #2 -inspection required
prior to foundation work
FOOTINGS
Setbacks
//~~~~q.J
Footings l/ ~ 1
Forms l
Reinfor ement
~~
FOUNDATION -per engineering
R-10 rigid @ perimeter - 24" vertical „~ ~~ ~~~
~` ~- ~ _
Stem Wall
Forms
Reinforcement
Anchor Bolts - 5/8" with 2" x 2" x 3/16" washers
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 5
Permit # BLD00-163 '
REQUIRED INSPECTIONS
PLUMBING -Barrier Free design required
Rough-in (D-W-V & clean outs)
_, Q (~ 3(/
Water supply D~
~ u3~d'V'~ l(
LPG supply
Pipe insulation
Pressure reduction valve if > SOpsi
Hose bibs - backflow protection required
Water heater
Seismic restraint 2 places
PR&T valve drain to exterior
R-10 if electric placed on slab
MECHANC><AL
LPG forced air furnace w/ ductwork
Combustion air 3/9~oi
Venting
Heat source equipment & controls
Factory applied nameplate
Manu's operating instructions attached
Unit identified for area served
Access and work space for maintenance
Disconnect
Condensate drain to approved location
NREC temperature zones
Thermostat controls
Deadband control
Nght setback w/7 different day types
Dampers
Ducting & duct insulation
R-7: supply & return in enclosed ceiling space
R-3.3: supply & return in conditioned space w/air
temperature <55 or>I05
Source specific fan w/exhaust terminus 3' from
building openings (bath fans)
Fresh air via building openings
APPROVED/DATE
'~
J
Ca1148 hours before you dig for utility line locates
i-800-424-5555
Page 2 of 5
RF.OiTiRF.D INSPECTIONS APPROVED/DATE
Peretit#BLD00-163
FRAMING -Minor Improvement Permit
approval required prior to final
Walls 2~ n~~ ~n
J `~ - y
J/
Weather resistive barrier ~
Engineered shear walls
Front & rear walls nailing: 7/16" plywood
w/8d @ 6" o.c. edges, 12" o.c. field
Roof
Eng'd truss plan required at inspection
Truss positive connection
Attic
Draft stop per 3000SF of attic space
Venting
Attic access
Posts, beams & headers
Fireblocking @ 10' o.c. horz. & vert.
Air seal
Windows - U-factor:.90 max.
NFRC window sticker must be on
windows at inspection time
Doors - U-factor:.60 (includes roll-ups)
CMU FAtrADE @ CORNERS (brick)
Wall ties 22 gage x'/." 24" o.c. w/hook engaging
horizontal joint reinforcement wire (9 B.W. gage)
Stud spacing
2x4 @ 16" o.c. & 2x6 @ 24" o.c. max.
Approved paper over sheathing
INSULATION ~ /O (~~ ~y fl~ ~ ~
! `
Wall R-11
Ceiling R-30
Ballles
VAPOR BARRIER
Paint, kraft paper or 4 mil visqueen
DRYWALL NAILING `~" ~ 3/D1
Walls
Ceiling
LIGHTING
See approved plans and NREC lighting summary
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Pamil # BLD00.163 ~
REQUIRED INSPECTIONS
APPRnVED/DATF.
PARKING
call John McDonagh @ BCD, 379-5085,
for inspection
I Barrier Free Van Accessible space required - ----- - -----
LANDSCAPING -plan to be submitted for
review and approval; landscaping installed prior
to final inspection
Per PTJD; call John McDonagh @ BCD, 379-5085
for inspection
FINAL
Property address posted w/ 5" numbers
Fire Department signoff
Public Works signoff
Electrical signoff (L&I)
Insulation certificate
Vapor barrier paint certificate (if applicable)
Barrier Free Access
Plumbing
MechanicaUHeating
Exits Signs & Illumination
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construMion shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for proteMion. of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
Call 48 hours before you dig for utility line locates
I-800.424-5555
Page 4 of 5
Yemtit # BLD00-163
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non•
residential project. A Temporary Certificate of Occupancy (TCO) request requires minimum 72 hours
notice.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates