HomeMy WebLinkAboutBLD00-160Waterman ~ Katr Building
761 Quinry Street, Suite 307
PoM1 Townsend, WA 98368
PhoM:(360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11 3 85-22 94 for Inspection
Permit Number: BLDOO-16O Issued: 9112100 Parcel Number: 989704002
Job Address: Intersection of Tavlor and Water Zoning: C-III Type: VV=N Occupancy: N/A
Nature of Work:
Owner: Rockv Friedman (Port Townsend Film Society) Contractor: Georee Yakush
(379b379)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
OTHER PERMTI'S REOUIItED:
Special Event permit through City Police Department to dose Taylor Street from midnight 9121/00 to Noon
9125/00 for the Port Townsend Film Festival.
NOTE: Alf elements ojconstrudion, including fastenings, blocking, etc require inspection prior to cover.
Arch shall not block sidewalks, crosswalk, or view ojpedestrians coming ojjthe curb onto the crosswalk.
Minimum IS feet distance between bottom of sign on arch and surface ojstreet right ojway.
RF(ITTTRFiI TNCPF.CTi[1NS
APPRnVED/DATE
FRAMING
Walls /Columns
Anchors
Arch
Positive Connections
Blocking
FINAL
Fire Department sign-off
Public Works sign-off
Police Department sign-off
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
PemtitN HLD00-160
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils ezposed during
construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3205 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2