Loading...
HomeMy WebLinkAboutBLD00-160Waterman ~ Katr Building 761 Quinry Street, Suite 307 PoM1 Townsend, WA 98368 PhoM:(360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDOO-16O Issued: 9112100 Parcel Number: 989704002 Job Address: Intersection of Tavlor and Water Zoning: C-III Type: VV=N Occupancy: N/A Nature of Work: Owner: Rockv Friedman (Port Townsend Film Society) Contractor: Georee Yakush (379b379) GENERAL CONDITIONS APPLY -SEE LAST PAGE OTHER PERMTI'S REOUIItED: Special Event permit through City Police Department to dose Taylor Street from midnight 9121/00 to Noon 9125/00 for the Port Townsend Film Festival. NOTE: Alf elements ojconstrudion, including fastenings, blocking, etc require inspection prior to cover. Arch shall not block sidewalks, crosswalk, or view ojpedestrians coming ojjthe curb onto the crosswalk. Minimum IS feet distance between bottom of sign on arch and surface ojstreet right ojway. RF(ITTTRFiI TNCPF.CTi[1NS APPRnVED/DATE FRAMING Walls /Columns Anchors Arch Positive Connections Blocking FINAL Fire Department sign-off Public Works sign-off Police Department sign-off Final -building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 PemtitN HLD00-160 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils ezposed during construMion shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for anon- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3205 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2