HomeMy WebLinkAboutBLD00-158WalemnedlCalzBiuldieg
181 Quuwy SOa.~ Sole 301
Sbrt Towmend WA 9t36t
Phom:(360)379320t Fnc (360)385-7675
i
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
7 9-
C~
Permit Number:
Job Address: 1939 Cook Avenue Zoning: R-I
Parcel Number:993-600.501/502/505/507
Type: VV=N Occupancy: R-3
Tota! Occupant Load: 2 Nature of Work: Revision #2: Add door tooaine mixture to
floor for the installation; increase BCI to 11 7/8" and
beam sizes to 3 1/Z" x 9 1/2" versa lam beams
Owner: Maria and David Timmons Contractor: Cranston Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFf1TTTRF.iI TNCPF.C'TTnNC
APPROVED/DATE
See also original permit and inspection record for
required inspections and conditions
FLOOR FRAMING
Joists -Engineered BCI plan shall be on-site at time
ofinspeetion; 117/8"BClper engineering O/<~k„G'oyX-r- /-3-0/
Engineered Beams - 3 %s"x 9 %s"versa-lams
FINA ee original inspection record
,~~ s ~~ ' ~ ~ 3 ° t3~ o
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
PamiIMBLD00.158R-2 +
1. Contractors working on this project are required to have a Labor & Industries contractor's re2istratian
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures-shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
1-800-424-5555
Page 2 of 2
• Wabmyn gl(gx Building
181 Quuxy SUeq Suite 301
Pon Tomnend, Wq 98)68
Phone: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD I
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call Inspection
Permit Number: BLDOO-IS8R-1 sued:9/26/00 Parcel Number: 993-600-501/502/505/507
Job Address: 1939 Cook Avenue Zoning: R-I Type: V-N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Construct barn/stable
Owner: Maria and David Timmons Contractor: Cranston Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• RE UIRED INSPECTIONS APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 and conditions of Street and
Utility Development Permit
Silt Fence
Drive OlI'Mat to restrict sediment from leaving
the site
FOOTINGS
SetbacksbK - iD%o/m o
Footings D ~ - r Clio loo
Forms ~K- /p//0/od
Concrete Curb
Thickened Slab Footing
Reinforcement O K - /D/1010 p ~ (~
LIFER
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
~~~a~,~.~s~a_, - .
REOUII2ED INSPECTIONS APPRnvF.nmA'rF
FOUNDATION
Stem Wall c9Kg~ io-a~-°°
Forms oK~< ,v-~~-oa
Reinforcement o f<~.c- ro -aa -moo
Anchor Bolts
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
FRAMING
Walls
Ceilings
Roof - engineered truss plan shall be on-site at time
of inspection /n~
~/~ Jn«(;orxc. /-3-0~
Truss Positive Connection
Treated Wood to Concrete
Fire Blocking
FINAL
Plumbing
Fina[-Buit ing ~, ~' ~- ~/ ~~
~~~~
I. Contractors working on this project are required to have s Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 3
J ;.
Permit K BI.D00-ISBa-1
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
• 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report correMions are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residentialproject.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval orior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMTT ON=BYTE WITH THE APPROVED PLANS.
•
• Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 3
-~.
-u
u
Waterman &. Katz Bwlding
181 Quinry Svee( Swle 301
Port Towm+end, WA 98368
Piwne: (360)379-3208 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call for Inspection
~~~ _ .sr
Permit Number: BLDOO-Z5g Issued: 9/07/00 Parcel Number: 993-600-501, -502, -505, -507
Job Address: 1939 Cook Avenue Zoning: R-I Type: V-N Occupancy: R-3
Total Occupant Load: 2 Nature of Work: Construct sinele-family residence
Owner: Maria and David Timmons Contractor: biscoverv Bav Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• RF:fITTTRF.TI TNCPF.(''TT(~NS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 and conditions of Street and
Utility Development Permit
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacksb/~ `io%o1°b
Footingsto/C!.lo~loo Q
Forms ®K ' LO/rot/~o ~
Reinforcement - #5- OK !o "/D'd~0~
Interior Column Footings
Deck Column Footings c~(~~r_ rt- -~~,
Thickened Slab for Stairs dk iz-~ti-<'
LIFER ®/C - Eofio/oo ~~
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page t of 4
P..
a~
a ~ •
ay'..
i
•
Permit M BI.DCO-158
RF.(1TTiRFTI TNCPF,C'TT(lNS APPROVED/DATE
FOUNDATION
Stem Wall o n~`-' ~° 13-`~
Forms v ~. ta_a~•-~`'
Reinforcement-per design o r~. ~o ~a3-aa
Engineered Holdowns ~!~ toa3~-o~
Anchor Bolts - 5/8" anchor bolts @ 4' o.c.
FLOOR FRAD~TG
Joists -Engineered BCI plan shall be on-site at time
of inspection
Blocking
Shield under Posts
Positive Connection -per design
Treated Wood to Concrete
Anchor Bolts -per design w/ 2" x 2 "x 3/]6"washers
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply ~ F.
Water Hammer Arrestor at clothes and dishwasher
Gas Supply EtiTo~~~.(,j~~~
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
18" A. F. F.
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
ground
6" - 24" above
~~^^
MECHANICAL
LPG Fireplace -manufacturer's installation
~~ ,
ifutructions shall be on-site at time of inspection
Whole House Fan - @ Bathroom
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
• Cal! 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 4
Permit p HIAOD-158
C
RF.(ITTTRF.n 1N4PF.CTinNS APPROVED/DATE
FRAMING
Walls
Sheathing -per engineering ~ iv , 2 _, z _ ~,,, 3r-=.
Ceilings''
Roof -engineered truss plan shall be on-site at time
of inspection /
Truss Positive Connection's
Attic Venting -ventilation @ 1/150 if located only at
eaves"
Windows -escape /
Window safety glazing
Windows Ufactor - .37 or better
NFRC window sticker.must be on windows, doors
and skylights at inspection time
Fyll life Door U-factor - .36 or better
Air Seal
Fresh Air Intake (Wall or Window Ports required)
Doors UFactor -see attached WATTSUN
Fire Blocking r
Weather Resistive Barrier ~
INSULATION ~
~'
Floor (R-30 ~ ~ ~-~J
W
ll
~~'
s (R_21)
a
~l
Ceiling (R=4 )
BaBles
Vapor Bamer required: paint, poly or faced balls
DRY WALL NAILING
Walls
Ceiling
'~ K~ 1- l7 'b I
Garage/Ilouse Occupancy Separation
FINAL
Public Works Sign-Off
Fire Department Sign-Off (T.PG)
House Numbers - 5"
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
r d
i
es
gn
Decks - e
' a -Buildin /~ I „ n
~~ (~ ,~~,o-rte ~Jer-~J(
3'~3~~~
Call 48 hours before:you dig for utility line locates
1-800-424-5555
Page3of4
r~
u
r~
u
Permit Y aLD00-758
1/ ,l
u
GENERAL. CONDTTiONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 385-2 2 94, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
• 6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required Public Works approval must be received urior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS.
• Calt 48 hours before you dig for utility line locates
1-800-424-5555
Page4of4
C~
r