Loading...
HomeMy WebLinkAboutBLD00-158WalemnedlCalzBiuldieg 181 Quuwy SOa.~ Sole 301 Sbrt Towmend WA 9t36t Phom:(360)379320t Fnc (360)385-7675 i CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE 7 9- C~ Permit Number: Job Address: 1939 Cook Avenue Zoning: R-I Parcel Number:993-600.501/502/505/507 Type: VV=N Occupancy: R-3 Tota! Occupant Load: 2 Nature of Work: Revision #2: Add door tooaine mixture to floor for the installation; increase BCI to 11 7/8" and beam sizes to 3 1/Z" x 9 1/2" versa lam beams Owner: Maria and David Timmons Contractor: Cranston Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RFf1TTTRF.iI TNCPF.C'TTnNC APPROVED/DATE See also original permit and inspection record for required inspections and conditions FLOOR FRAMING Joists -Engineered BCI plan shall be on-site at time ofinspeetion; 117/8"BClper engineering O/<~k„G'oyX-r- /-3-0/ Engineered Beams - 3 %s"x 9 %s"versa-lams FINA ee original inspection record ,~~ s ~~ ' ~ ~ 3 ° t3~ o Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 1 of 2 PamiIMBLD00.158R-2 + 1. Contractors working on this project are required to have a Labor & Industries contractor's re2istratian number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures-shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates • 1-800-424-5555 Page 2 of 2 • Wabmyn gl(gx Building 181 Quuxy SUeq Suite 301 Pon Tomnend, Wq 98)68 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call Inspection Permit Number: BLDOO-IS8R-1 sued:9/26/00 Parcel Number: 993-600-501/502/505/507 Job Address: 1939 Cook Avenue Zoning: R-I Type: V-N Occupancy: R-3 Total Occupant Load: 2 Nature of Work: Construct barn/stable Owner: Maria and David Timmons Contractor: Cranston Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 and conditions of Street and Utility Development Permit Silt Fence Drive OlI'Mat to restrict sediment from leaving the site FOOTINGS SetbacksbK - iD%o/m o Footings D ~ - r Clio loo Forms ~K- /p//0/od Concrete Curb Thickened Slab Footing Reinforcement O K - /D/1010 p ~ (~ LIFER • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 ~~~a~,~.~s~a_, - . REOUII2ED INSPECTIONS APPRnvF.nmA'rF FOUNDATION Stem Wall c9Kg~ io-a~-°° Forms oK~< ,v-~~-oa Reinforcement o f<~.c- ro -aa -moo Anchor Bolts PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi FRAMING Walls Ceilings Roof - engineered truss plan shall be on-site at time of inspection /n~ ~/~ Jn«(;orxc. /-3-0~ Truss Positive Connection Treated Wood to Concrete Fire Blocking FINAL Plumbing Fina[-Buit ing ~, ~' ~- ~/ ~~ ~~~~ I. Contractors working on this project are required to have s Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. Ca1148 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 3 J ;. Permit K BI.D00-ISBa-1 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. • 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report correMions are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residentialproject. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval orior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMTT ON=BYTE WITH THE APPROVED PLANS. • • Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 3 -~. -u u Waterman &. Katz Bwlding 181 Quinry Svee( Swle 301 Port Towm+end, WA 98368 Piwne: (360)379-3208 Faz: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call for Inspection ~~~ _ .sr Permit Number: BLDOO-Z5g Issued: 9/07/00 Parcel Number: 993-600-501, -502, -505, -507 Job Address: 1939 Cook Avenue Zoning: R-I Type: V-N Occupancy: R-3 Total Occupant Load: 2 Nature of Work: Construct sinele-family residence Owner: Maria and David Timmons Contractor: biscoverv Bav Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • RF:fITTTRF.TI TNCPF.(''TT(~NS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 and conditions of Street and Utility Development Permit Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacksb/~ `io%o1°b Footingsto/C!.lo~loo Q Forms ®K ' LO/rot/~o ~ Reinforcement - #5- OK !o "/D'd~0~ Interior Column Footings Deck Column Footings c~(~~r_ rt- -~~, Thickened Slab for Stairs dk iz-~ti-<' LIFER ®/C - Eofio/oo ~~ • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page t of 4 P.. a~ a ~ • ay'.. i • Permit M BI.DCO-158 RF.(1TTiRFTI TNCPF,C'TT(lNS APPROVED/DATE FOUNDATION Stem Wall o n~`-' ~° 13-`~ Forms v ~. ta_a~•-~`' Reinforcement-per design o r~. ~o ~a3-aa Engineered Holdowns ~!~ toa3~-o~ Anchor Bolts - 5/8" anchor bolts @ 4' o.c. FLOOR FRAD~TG Joists -Engineered BCI plan shall be on-site at time of inspection Blocking Shield under Posts Positive Connection -per design Treated Wood to Concrete Anchor Bolts -per design w/ 2" x 2 "x 3/]6"washers PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply ~ F. Water Hammer Arrestor at clothes and dishwasher Gas Supply EtiTo~~~.(,j~~~ Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric 18" A. F. F. Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate ground 6" - 24" above ~~^^ MECHANICAL LPG Fireplace -manufacturer's installation ~~ , ifutructions shall be on-site at time of inspection Whole House Fan - @ Bathroom Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) • Cal! 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Permit p HIAOD-158 C RF.(ITTTRF.n 1N4PF.CTinNS APPROVED/DATE FRAMING Walls Sheathing -per engineering ~ iv , 2 _, z _ ~,,, 3r-=. Ceilings'' Roof -engineered truss plan shall be on-site at time of inspection / Truss Positive Connection's Attic Venting -ventilation @ 1/150 if located only at eaves" Windows -escape / Window safety glazing Windows Ufactor - .37 or better NFRC window sticker.must be on windows, doors and skylights at inspection time Fyll life Door U-factor - .36 or better Air Seal Fresh Air Intake (Wall or Window Ports required) Doors UFactor -see attached WATTSUN Fire Blocking r Weather Resistive Barrier ~ INSULATION ~ ~' Floor (R-30 ~ ~ ~-~J W ll ~~' s (R_21) a ~l Ceiling (R=4 ) BaBles Vapor Bamer required: paint, poly or faced balls DRY WALL NAILING Walls Ceiling '~ K~ 1- l7 'b I Garage/Ilouse Occupancy Separation FINAL Public Works Sign-Off Fire Department Sign-Off (T.PG) House Numbers - 5" Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors r d i es gn Decks - e ' a -Buildin /~ I „ n ~~ (~ ,~~,o-rte ~Jer-~J( 3'~3~~~ Call 48 hours before:you dig for utility line locates 1-800-424-5555 Page3of4 r~ u r~ u Permit Y aLD00-758 1/ ,l u GENERAL. CONDTTiONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Z. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 385-2 2 94, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received urior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS. • Calt 48 hours before you dig for utility line locates 1-800-424-5555 Page4of4 C~ r