Loading...
HomeMy WebLinkAboutBLD00-153Waterman & Kstx Building 153 Quincy Street, Sufle 701 Port rawreend, Wp 98768 Phone: 3603793208 Fax 360385-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-153R-Z Issued: 9128/00 Parcel Number: 988800702 Job Address: 410 Lincoln Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: add 2 Nature of Work: Revision: Install hydronic tubine in 3d floor install new radiators master and euest bedrooms. Owner: Bruce and Julia Marston Revocable Trust Contractor: Townsend Builders 385-1938/301-1664 GENERAL CONDITIONS APPLY: See last pale SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE REVISION Refer to original inspection record 9~~~~~~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #OOd 53R-2 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected • prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-af--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. AI- elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works aanroval must 6e 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All. building permits expire if no progress has been made within six months, or if no inspections are done by the Building. Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Walaraen & Kats HWIdinB 181 Quiney Slr<et, SW1e 301 Pat Tawiuewd, WA 98368 PM1one: 3683793208 Faa 3683657675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-IS3R-)l Issued: 9106!00 Parcel Number: 988800702 Job Address: 410 Lincoln Street Zoning: RR=II Type: V_N Occupancy: R_3 Total Occupant Load: add 2 Nature of Work: Revision: Exoand shower, new stair detail and landing change handrail location, fur valley rafter for insulation Owner: Bruce and Julia Marston Revocable Trust Contractor: Townsend Builders 385-1938/301-1664 GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REOUHiED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE REVISION Refer to original inspection record ~/ ,~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. • CALL 48 hours before yoq dig for Utility line locates 1-800.424-5555 Page 1 of 2 Building Permit #OOd 53Rd 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-af--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294, press 3. A minimum of twenri-four hours notice is required. Public Works approval must be received prior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits ezpire if no progress has been made within sis months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2 Waterman & K.a auuNng 18l Quinq ScrM, Su{a 781 Purl Towmeml. WA 98768 Phone: 768-7793208 Fu 360J88-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-1~3 Issued: 8111/00 Parcel Number: 988800702 Job Address: 410 Lincoln Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: add 2 Nature of Work: Residential Remodel Owner: Bruce and Julia Marston Revocable Trust Contractor: Townsend Builders 385-1938/301-1664 GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMITS REOUIItED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.Oi1iRED INSPECTIONS APPROVED/DATE FLOOR FRAMING ~j ., / /~D Joists-sister2"x6"DF#2 each side of existing /~ ~ -/ G` ~%(~ ceiling joists per engineering Blocking Positive Connection PLUMBING Water supply -update F-2 bathroom frxtures @ ~~~~~ existing locations Pressure Reduction Valve if pressure > 80psi MECHANICAL Whole house ventilation -fan and controls not required to be updated unless existing ventilation system is altered Source Specific Exhaust Fans @ bathroom (SOcfm) - if new fan is to be installed CALL 48 hours before you dig for Utility line locates I-800-424-5555 Page 1 of 3 Building Pumd t/00-133 REQUIRED INSPECTIONS APPRnVF.I)/DATF. FRAMING Walls Zd Cd/~ f3ettta !01/o~oQ ~. Ceiling Roof Stairs J n 9j ~ r--G9{9'R~ G ('ll ~f ~ l'J~ Handrail V Engineered roof connection detail Attic venting - eave @ I/I50 C~-~j dip 5 ~ Z' ~~~ Posts, beams and headers Windows -safety glazing Windows - U-factor NFRE sticker must be on windows at time of Inspection Fresh Air Intake -wall port Air Seal Fireblocking Weather Resistive Barrier INSULATION ,~{ ~~(2, ~6~ZYti ~tt~i,~t~(/P,zC: / // ap Wails (R-19 required at new walls) Walls (fill cavities @ existing walls) f / j / QfY7C~ ~Q~ ~ ~ l Z ~ / / Ceiling (R-30) Baffles ( Vapor Barrier required - 4 mil poly, faced bans or vapor barrier paint DRYWALL NAILING Walls „/ / (/2 ~/ C'U Ceiling II Enclosed Usable Space under Stairs FINAL House Numbers -check for 5" numbers ,L / ~~/~ Plumbing / `~ (, Mechanical l Insulation Certificate Vapor Barrier Paint Certificate (if applicable) Smoke Detectors throughout per UBC: one in each sleeping room, in area leading fo each sleeping with minimum one on eachJloor Final -building .J Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Permit #00.153 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall 6e kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is repaired. Public Works aaaroval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within-six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. `~ Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 3 of 3 ,~