CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-153R-Z Issued: 9128/00 Parcel Number: 988800702
Job Address: 410 Lincoln Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: add 2 Nature of Work: Revision: Install hydronic tubine in 3d floor install
new radiators master and euest bedrooms.
Owner: Bruce and Julia Marston Revocable Trust Contractor: Townsend Builders
385-1938/301-1664
GENERAL CONDITIONS APPLY: See last pale
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RE UIRED INSPECTIONS APPROVED/DATE
REVISION
Refer to original inspection record 9~~~~~~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #OOd 53R-2
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected •
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-af--way shall be
kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. AI- elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294,
press 3. A minimum of twenty-four hours notice is required. Public Works aanroval must 6e
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All. building permits expire if no progress has been made within six months, or if no inspections
are done by the Building. Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Walaraen & Kats HWIdinB
181 Quiney Slr<et, SW1e 301
Pat Tawiuewd, WA 98368
PM1one: 3683793208 Faa 3683657675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-IS3R-)l Issued: 9106!00 Parcel Number: 988800702
Job Address: 410 Lincoln Street Zoning: RR=II Type: V_N Occupancy: R_3
Total Occupant Load: add 2 Nature of Work: Revision: Exoand shower, new stair detail and
landing change handrail location, fur valley rafter for insulation
Owner: Bruce and Julia Marston Revocable Trust Contractor: Townsend Builders
385-1938/301-1664
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REOUHiED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RE UIRED INSPECTIONS APPROVED/DATE
REVISION
Refer to original inspection record ~/ ,~
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
• CALL 48 hours before yoq dig for Utility line locates
1-800.424-5555
Page 1 of 2
Building Permit #OOd 53Rd
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-af--way shall be
kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294,
press 3. A minimum of twenri-four hours notice is required. Public Works approval must be
received prior to scheduline the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits ezpire if no progress has been made within sis months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2
Waterman & K.a auuNng
18l Quinq ScrM, Su{a 781
Purl Towmeml. WA 98768
Phone: 768-7793208 Fu 360J88-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-1~3 Issued: 8111/00 Parcel Number: 988800702
Job Address: 410 Lincoln Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Occupant Load: add 2 Nature of Work: Residential Remodel
Owner: Bruce and Julia Marston Revocable Trust Contractor: Townsend Builders
385-1938/301-1664
GENERAL CONDITIONS APPLY: See last sage
SEPARATE PERMITS REOUIItED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.Oi1iRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING ~j
., /
/~D
Joists-sister2"x6"DF#2 each side of existing /~
~
-/ G` ~%(~
ceiling joists per engineering
Blocking
Positive Connection
PLUMBING
Water supply -update F-2 bathroom frxtures @ ~~~~~
existing locations
Pressure Reduction Valve if pressure > 80psi
MECHANICAL
Whole house ventilation -fan and controls not
required to be updated unless existing ventilation
system is altered
Source Specific Exhaust Fans @ bathroom (SOcfm)
- if new fan is to be installed
CALL 48 hours before you dig for Utility line locates
I-800-424-5555
Page 1 of 3
Building Pumd t/00-133
REQUIRED INSPECTIONS APPRnVF.I)/DATF.
FRAMING
Walls Zd Cd/~ f3ettta !01/o~oQ ~.
Ceiling
Roof
Stairs J n
9j ~ r--G9{9'R~ G ('ll ~f ~ l'J~
Handrail V
Engineered roof connection detail
Attic venting - eave @ I/I50
C~-~j dip 5 ~ Z' ~~~
Posts, beams and headers
Windows -safety glazing
Windows - U-factor
NFRE sticker must be on windows at time of
Inspection
Fresh Air Intake -wall port
Air Seal
Fireblocking
Weather Resistive Barrier
INSULATION ,~{ ~~(2, ~6~ZYti ~tt~i,~t~(/P,zC: / // ap
Wails (R-19 required at new walls)
Walls (fill cavities @ existing walls)
f
/
j /
QfY7C~ ~Q~ ~ ~
l Z
~
/ /
Ceiling (R-30)
Baffles (
Vapor Barrier required - 4 mil poly, faced bans or
vapor barrier paint
DRYWALL NAILING
Walls „/
/ (/2 ~/ C'U
Ceiling II
Enclosed Usable Space under Stairs
FINAL
House Numbers -check for 5" numbers
,L / ~~/~
Plumbing / `~ (,
Mechanical l
Insulation Certificate
Vapor Barrier Paint Certificate (if applicable)
Smoke Detectors throughout per UBC: one in each
sleeping room, in area leading fo each sleeping with
minimum one on eachJloor
Final -building
.J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Permit #00.153
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall 6e
kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294,
press 3. A minimum of twenty-four hours notice is repaired. Public Works aaaroval must be
received prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within-six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year to
keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
`~ Call 48 hours before you dig Tor utility line locates
1-800-424-5555