CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-152 Issued: 7/27100 Parcel Number: 988801403
Job Address: 806 Garfield Zoning: RR=II Type: V-N Occupancy: RR=3
Total Occupant Load: No Chance Nature of Work: Remove existing cedar shingle roof,
replace sheeting and install asphalt shingle roof.
Owner: Frank Brou Contractor: Hope Roofing (385-5653)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE IJIRED INSPECTIONS
APPROVED/DATE
DEMOLTTION
All construction debris to be deposited in
Jefferson County Landfill per plans or other
location in accordance with all local, state
and federal laws.
SHEATHING
7/16" OSB requires 8d @ 6" o.c. edges &
12" field or 1'/a" staples @ 6" o.c. edges and
field.
INSULATION
- Fill any exposed cavities
- Baffles at vented bays
ROOF VENTING
Net free ventilation azea shall not be less than
1 sfl150sf of the azea of the space ventilated,
if 50 percent of the required ventilation area
is located at least 3' above the eve or cornice
vents the net ventilation azea may be
lsf/300sf. Openings shall be covered with
corrosion resistant'/1' mesh.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit tkBLD00-157
FINAL
House Numbers - 5" numbers of contrasting
color posted near main entrance of house and
visible from street per City Ordinance
Final -Building
GENERAL CONDITIONS
Y. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-.site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris.. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engincering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have bcen completed and inspected. For Public Works inspection call 385-2294, press 3.
A minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. Afl building permits ezpire if no progress has bcen made within siz months, or if no inspections are
done by the Building Department within one year. Call for at (east one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department ~ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555