HomeMy WebLinkAboutBLD00-051walm„~, ~ x,l~ Hwl~
181 Quinry S4eet, Suile 301
Port Townmd, WA 98368
Phonc: (360)379-3208 Fuc: (;60)385-7675
•
CITY OF PORT
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-ISIR-I Issued: 12/12/00 Parcel Number: 951-904-701
Job Address: 4748 Mason Street Zoning: R-I Type: V_N Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Revision #1: Change heat source to electric:
delete f4) windows -refer to revised WATTSUN
Owner: Anthony and Betty Harriman
Contractor: Cranston Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMTfS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
APPROVED/DATE
See also orlginallnspectionBecord
FRAMING
Windows Ufactor - .39/.35/.51 -see WATTSUN
NFRC window sticker must be on windows and
doors at inspection time
boors U-Factor - .41/.37 or better
INSULATION -see attached WATTSUN
Floor (R~30 )
Walls (R;21 )
Ceiling (R-30/R-49 )
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pmnit M BI,D00-IS tR-I
C J
.ENF.RAL CONDiTTONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11 38 5-2 2 94, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details}. Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of }wrnty-(mrr hnnrc nntira is rwmu~ad PuF.lir Wn~4c e..nrn..nl .....cf do ~o..e...od ..~..... ~..
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS.
Call 48 hours before you dig Tor utility line locates
1-800-424-5555
Page 2 of 2
walunan at xatz s,~aa;ng
tat Queer st~eec su;m Sot
Pen ror~ena, wn 9sua
Phone: (360)3793208 Fax: (760)385.7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-151 Issued: 8/18/00 Parcel Number: 951-904-701
Job Address: 4748 Mason Street Zoning: R-I Type: VV=N Occupancy: R-3
Total Occupant Load: 4 Nature of Work: Construct single-family residence
Owner: Anthony and Betri Harriman- Contractor: Cranston Construction
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
•
REOIJIRED INSPECTIONS
APPRO VED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ~ ~ n ~~OD ~ '
`7 ~
Footings
Forms
Reinforcement
Interior Footings - 2 " x 2 " x 8 " w/ (2) #4 each way
~?er-sk,Piers
~ ~ ~~
J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
r~atastnoo.ut ,
RE UIRED INSPECTIONS APPRO ' DiDATE
FOUNDATION
Stem Wall
r
/
fin
Forms ~
~
f
f l lY""
(`,
Reinforcement r
C
Engineered Holdowns
Anchor Bolts w/ 2" x 2" x 3/16" washers
Foundation Vents -12 required
Crawl Space Access
FLOOR FRAMING
Girder
~/~/0 ~ nn
/ .j/
Joists -Engineered BCI plan shall be on-site at time C l "`---~~~ ~~~ ,,,
of inspection
Blocking
Shield under Posts
Positive Connections
Girder to Concrete
Treated Wood to Concrete
Anchor Bolts w/ 2" x 2"x 3/16" washers
Foundation Vents -12 required
Crawl Space Access
PLUMBING:
Rough-In (D-V-T & Clean outs}
1 0~~5/(~(j
Water Supply
Water Hammer Arresters
Gas Supply
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Hester
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
LPG Heater
Whole House Fan -Utility Room ~~ /
~ 7i5 (~
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
J
Calf 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 4
Pmnit q BID00.1$1
C,
u>~nrlTU>a; n ifNCPFrTTnNC APPROVED/DATE
1\1J Vii`LL 11 \AJi 1J
FRAMING
Walls ~~~~~~ ` .~
Engineered Shear Walls
Ceilings
Roof- engineered truss plan shall be on-site at time
of inspection
Truss Positive Connection
Attic Venting - eave and ridge
10/Zs~I~C~
Windows -escape
Window safety glazing ~
Windows Ufactor - .50 or better
NFRC window sticker must be on windows and
doors at inspection time
Air Seal
Fresh Air Intake (Window Ports)
Doors U-Factor - .47 or better
Fire Blocking
Weather Resistive Barrier
INSULATION
19
Fl
R / / 1 ~ Q~ ~
(/L/G(
~/j' ~ r, ~ /~~ ~~
(/
oor (
_
) ,CJ L
Walls (R=19 )
Ceiling (R=30 )
Baffles
Vapor Barrier: paint
Crawl space - 6 mil black poly
DRY WALL NAII,ING ~/ /~~
Walls -
Engineered Shear Walls
Ceiling
FINAL
Public Works Sign-Off
Fire Department Sign-Off (LPG)
House Numbers - 5" /
Plumbing ~~~
r ~
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Pttmit It BLDW-I51
I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily. stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
.complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
scheduline thethe Buildin~Denartment's final inspectionfinal inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. A11 building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800.424-5555
Page 4 of 4