Loading...
HomeMy WebLinkAboutBLD00-051walm„~, ~ x,l~ Hwl~ 181 Quinry S4eet, Suile 301 Port Townmd, WA 98368 Phonc: (360)379-3208 Fuc: (;60)385-7675 • CITY OF PORT CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-ISIR-I Issued: 12/12/00 Parcel Number: 951-904-701 Job Address: 4748 Mason Street Zoning: R-I Type: V_N Occupancy: R-3 Total Occupant Load: 4 Nature of Work: Revision #1: Change heat source to electric: delete f4) windows -refer to revised WATTSUN Owner: Anthony and Betty Harriman Contractor: Cranston Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMTfS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE See also orlginallnspectionBecord FRAMING Windows Ufactor - .39/.35/.51 -see WATTSUN NFRC window sticker must be on windows and doors at inspection time boors U-Factor - .41/.37 or better INSULATION -see attached WATTSUN Floor (R~30 ) Walls (R;21 ) Ceiling (R-30/R-49 ) Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pmnit M BI,D00-IS tR-I C J .ENF.RAL CONDiTTONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 38 5-2 2 94, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details}. Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of }wrnty-(mrr hnnrc nntira is rwmu~ad PuF.lir Wn~4c e..nrn..nl .....cf do ~o..e...od ..~..... ~.. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS. Call 48 hours before you dig Tor utility line locates 1-800-424-5555 Page 2 of 2 walunan at xatz s,~aa;ng tat Queer st~eec su;m Sot Pen ror~ena, wn 9sua Phone: (360)3793208 Fax: (760)385.7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-151 Issued: 8/18/00 Parcel Number: 951-904-701 Job Address: 4748 Mason Street Zoning: R-I Type: VV=N Occupancy: R-3 Total Occupant Load: 4 Nature of Work: Construct single-family residence Owner: Anthony and Betri Harriman- Contractor: Cranston Construction GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • REOIJIRED INSPECTIONS APPRO VED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~ ~ n ~~OD ~ ' `7 ~ Footings Forms Reinforcement Interior Footings - 2 " x 2 " x 8 " w/ (2) #4 each way ~?er-sk,Piers ~ ~ ~~ J Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r~atastnoo.ut , RE UIRED INSPECTIONS APPRO ' DiDATE FOUNDATION Stem Wall r / fin Forms ~ ~ f f l lY"" (`, Reinforcement r C Engineered Holdowns Anchor Bolts w/ 2" x 2" x 3/16" washers Foundation Vents -12 required Crawl Space Access FLOOR FRAMING Girder ~/~/0 ~ nn / .j/ Joists -Engineered BCI plan shall be on-site at time C l "`---~~~ ~~~ ,,, of inspection Blocking Shield under Posts Positive Connections Girder to Concrete Treated Wood to Concrete Anchor Bolts w/ 2" x 2"x 3/16" washers Foundation Vents -12 required Crawl Space Access PLUMBING: Rough-In (D-V-T & Clean outs} 1 0~~5/(~(j Water Supply Water Hammer Arresters Gas Supply Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Hester Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL LPG Heater Whole House Fan -Utility Room ~~ / ~ 7i5 (~ Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from opening) J Calf 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 4 Pmnit q BID00.1$1 C, u>~nrlTU>a; n ifNCPFrTTnNC APPROVED/DATE 1\1J Vii`LL 11 \AJi 1J FRAMING Walls ~~~~~~ ` .~ Engineered Shear Walls Ceilings Roof- engineered truss plan shall be on-site at time of inspection Truss Positive Connection Attic Venting - eave and ridge 10/Zs~I~C~ Windows -escape Window safety glazing ~ Windows Ufactor - .50 or better NFRC window sticker must be on windows and doors at inspection time Air Seal Fresh Air Intake (Window Ports) Doors U-Factor - .47 or better Fire Blocking Weather Resistive Barrier INSULATION 19 Fl R / / 1 ~ Q~ ~ (/L/G( ~/j' ~ r, ~ /~~ ~~ (/ oor ( _ ) ,CJ L Walls (R=19 ) Ceiling (R=30 ) Baffles Vapor Barrier: paint Crawl space - 6 mil black poly DRY WALL NAII,ING ~/ /~~ Walls - Engineered Shear Walls Ceiling FINAL Public Works Sign-Off Fire Department Sign-Off (LPG) House Numbers - 5" / Plumbing ~~~ r ~ Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors Final -Building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pttmit It BLDW-I51 I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily. stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is .complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduline thethe Buildin~Denartment's final inspectionfinal inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. A11 building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMTT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800.424-5555 Page 4 of 4