CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-ISO Issued: 8/16/00 Parcel Number: 985207303
Job Address: 825 V Street Zoning: RR=II Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 5/1 Nature of Work: Construct Single family residence with
attached garage and greenhouse
Owner: Ben Shaine & Marci Thurston Contractor: Seraphim Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE I ~ n ~~
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
~. RFCITTTRFT) TNSPF.C"'TTONS
yl,~o, ~:~ ~,o~C
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
GROUNDWORK PLUMBING ~
~/~
Pressure Test ~
Pipe joints Exposed
Pipe Bedding -
Propane Drain
FOOTINGS
Setbacks
/~I/ /D~
Footings //
Engineered retaining wall footings, Sheet SE-I
Porch Footings
Pergola Footings
Forms
Reinforcement - (3) #S @ Detail S9, Sheet SE-1
UFER
Call 48 hours before you dig far utility line -ocates
1-800-424-5555
Page 1 of d
Pmeit M BLD00-ISO
REO[TIRED INSPF.C:Ti()Nfi APPRnvll.nmeTF.
FOUNDATION
Stem Wall -engineered walls @ lower level
~ /~J~l ~~
Forms "'~~
Reinforcement
Anchor Bolts - S/8" i
Engineered Holdown Hardware -see Sheets 3 & SE-1
Waterproofing
. ~I
SLAB
Reinforcement
Interior Footing
Insulation
~ L ~ G179
FLOOR FRAMING
engineered BCI plan shall be on-site at
time of inspection
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Botts
Foundation Vents
PLUMBING:-
Rough-In (D-V-T & Clean outs) A
/ /f
~~~j'/ / //
Water Supply -
t l ~~ /l l..('
Water Hammer Arrester
Gas Supply /
O~
Z/ZZ
Hose Bibs (baclcflow protection required) /
( !!!
ation (R-3
essure e u n Valve if> p
Water Heater-
Seismic Restraint - 2 places
Pressure. relief valve drain to exterior, termin e
"above ground
ECHANICAL
LPG Heaters -installation instructio Il be on-site at
time of inspection _ n
l f/~~,,..J J )~J` J
r
/ U
(
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 4
~~
r
RRCITTTRFA TNSPECTIONS
Yrnnit M BLD00-150
APPROVED/DATE
FRAMING:
Engineered Shear Walls- exterior & interior
/
~~
~ /j
'
Walls . /
/
'/'~f~
Positive Connections
Floors/Ceilings
Engineered Posts Beams & Headers
Roof
Rafter Positive Connection
Attic Venting - eave and ridge
Windows- escape
Windows -safety glazing
Windows Ufactor - .45 or better
NFRC window sticker must be on windows and doors
Air Seal
Fresh Air Intake (window ports)
Doors U-Factor - .40 or better
Fire Blocking
Weather Resistive Barrier
Greenhouse
INSULATION ~
Slab (R-10) ~ j ~~~~~~
~~
Thermal Break @ garage
Floor (R-25 )
Walls (R-19 )
Ceiling (R-30 vault )
Baffles ~ ,
Vapor Barrier: paint
DRY WALL NAILING
Walls / ~~/Q
/
Ceiling
Enclosed Space Under Stairs
Gazage/House Occupancy Separation
FINAL
Fire Department Sign-Off (LPG) _
~ L~/l~t p (-~~ T ~Z S/D~
Public Works Sign-Off l
House Numbers - 5"
Plumbing
Mechanical/Heating
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors
Final- greenhouse
Final -Building
Call 48 hours before you dig far utility line locates
1-800.424-5555
Page 3 of 4
i
Permit #BLD00-15D
.F.NERAi, f'UNDiTTONC
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construMion; call 385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction sfiall be temporarily stabi{ized with matching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction ig
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works aaoroval must be received prior to
scheduling the Building Department's final insuection.
Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
$. All building permits expire if o progress has been made within six months, or if no inspections are done
by the Building Department~ithin one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THI5 PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4