Loading...
HomeMy WebLinkAboutBLD00-148_~ Waterman & Katz Building .. ' ~ 181 Quinsy St, Suite 301 PoR Townxnd, W A 98368 Phone (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD00-148R-1 Job Address: 450 Fir Street Occupancy: N/C Type: N/C Total Occupant Load: No Change Nature of Work: Reaair main office building roof: remove existing built-uu roofing, replace sheathing and install new torch-down roof covering Owner: Port Townsend School District loo. 50 GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.f1iTiRF.T) INSPF.('TiONS Contractor: All About Building APPROVED/DATE PEDESTRIAN PROTECTION Inspection required before begirming work Provide protection per UBC as needed during Construction. SEDIlVIENT CONTROL ' Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION Fill any exposed roof cavities. SHEATffiNG/NAILING (if applicable) 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/I' staples @ 6" o.c. edges and field. Issued: 10/06/00 Parcel Number: 931403001 Zoning: PP=1 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 rams nss.oaaiasx-r REOiJIRED INSPECTIONS APPROVED/DATF, ROOF VENTING Provide ventilation if current venting is inadequate to meet code requirements ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter 15 ROOF DRAINAGE Drainage to be provided per UBC Section 1506 FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomp{ished. 2. Temporary erosion and sediment control (TESC) measures shall beinstalled on-site and inspected prior to beginning construction; tall 3852294. Measures shall include installation of silt fencing and graveled construction entrance (ace attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc Soils shall be permanently stabilized with seeding, plantings, sodding, eta once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engincering including nailing, holdowns, sheathing, and akernate braced wall panels (ABWP) requve inspection prior to cover. 4. Owner or owner's agent shall review and. oversce correction of any and all deficiencies noted by required inspections: 5. Re-inspection is required after inspection report corrections are completed. 6. The Buflding Department is unable to pass final inspection on your project until Public Works requirements have bcen completed and inspected. For Public Works inspection ca113852294. 7. Ca1148 hours before you dig for utility tine locates 1-800-424-5555 Page 2 of 3 Permit #BLIJ00-148R-1 8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 9. All building permits expire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 10. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 Waterman & Katz Building 181 Quuwy St, Suite 301 Port Townsend µ'f+98368 Phone (360) 379-3208 Fax: (360) 385-7675 C~ i • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD00-148 Issued: 10/06/00 Parcel Number: 931403001 dob Address: 450 Fir Street Zoning: PP=1 Occupancy: N/C Type: N/C Total Occupant Load: Na Change Nature of Work: Repair Qvmnasium roof: remove eaistinQ built-uo roofing. replace sheathing a install new torch-down roof covering Owner: Port Townsend School District No. 50 Contractor: All About Buildine GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE PEDESTRIAN PROTECTION Inspection required before beginning work Provide protection per TJBC as needed during Construction. SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION Fill any exposed roof cavities. SHEA'THING/NAILING (if applicable) 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/." staples @ 6" o.c. edges and field. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit #BLD00-148 REQUIRED INSPECTIONS APPROVED/DATE ROOF VENTING Provide ventilation if current venting is inadequate to meet code requirements ROOFING Install all roofing material per manufacturer's specifications and UBC Chapter IS ROOF DRAINAGE Drainage to be provided per UBC Section 1506 FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street per City Ordinance Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S-2294. Measures shall include installation of sik fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and akernate braced wall panels (ABWP) require inspection prior to cover.. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. 7. A minimum of twenty-four hours notice is required. Public Works aooroval must be received arior to Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 3 Permit #BLD00-148 8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 9. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 10. Revisions require submittal & approval prior to making changes in the £eld. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. C Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 0