CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-148R-1
Job Address: 450 Fir Street
Occupancy: N/C Type: N/C
Total Occupant Load: No Change
Nature of Work: Reaair main office building roof: remove existing built-uu roofing, replace
sheathing and install new torch-down roof covering
Owner: Port Townsend School District loo. 50
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.f1iTiRF.T) INSPF.('TiONS
Contractor: All About Building
APPROVED/DATE
PEDESTRIAN PROTECTION
Inspection required before begirming work
Provide protection per UBC as needed during
Construction.
SEDIlVIENT CONTROL '
Rights of way shall be kept free of dirt and debris and
swept as needed during construction.
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
INSULATION
Fill any exposed roof cavities.
SHEATffiNG/NAILING (if applicable)
7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/I'
staples @ 6" o.c. edges and field.
Issued: 10/06/00
Parcel Number: 931403001
Zoning: PP=1
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
rams nss.oaaiasx-r
REOiJIRED INSPECTIONS APPROVED/DATF,
ROOF VENTING
Provide ventilation if current venting is inadequate to meet
code requirements
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter 15
ROOF DRAINAGE
Drainage to be provided per UBC Section 1506
FINAL
Building Numbers - 5" numbers of contrasting color
posted near main entrance of building and visible from
street per City Ordinance
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomp{ished.
2. Temporary erosion and sediment control (TESC) measures shall beinstalled on-site and inspected
prior to beginning construction; tall 3852294. Measures shall include installation of silt fencing and
graveled construction entrance (ace attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc Soils shall be permanently stabilized with seeding, plantings, sodding, eta once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engincering including nailing, holdowns, sheathing, and akernate braced wall panels
(ABWP) requve inspection prior to cover.
4. Owner or owner's agent shall review and. oversce correction of any and all deficiencies noted by
required inspections:
5. Re-inspection is required after inspection report corrections are completed.
6. The Buflding Department is unable to pass final inspection on your project until Public Works
requirements have bcen completed and inspected. For Public Works inspection ca113852294.
7.
Ca1148 hours before you dig for utility tine locates
1-800-424-5555
Page 2 of 3
Permit #BLIJ00-148R-1
8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
9. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
10. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
Waterman & Katz Building
181 Quuwy St, Suite 301
Port Townsend µ'f+98368
Phone (360) 379-3208 Fax: (360) 385-7675
C~
i
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-148 Issued: 10/06/00 Parcel Number: 931403001
dob Address: 450 Fir Street Zoning: PP=1
Occupancy: N/C Type: N/C Total Occupant Load: Na Change
Nature of Work: Repair Qvmnasium roof: remove eaistinQ built-uo roofing. replace sheathing a
install new torch-down roof covering
Owner: Port Townsend School District No. 50 Contractor: All About Buildine
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
APPROVED/DATE
PEDESTRIAN PROTECTION
Inspection required before beginning work
Provide protection per TJBC as needed during
Construction.
SEDIMENT CONTROL
Rights of way shall be kept free of dirt and debris and
swept as needed during construction.
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
INSULATION
Fill any exposed roof cavities.
SHEA'THING/NAILING (if applicable)
7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 '/."
staples @ 6" o.c. edges and field.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit #BLD00-148
REQUIRED INSPECTIONS APPROVED/DATE
ROOF VENTING
Provide ventilation if current venting is inadequate to meet
code requirements
ROOFING
Install all roofing material per manufacturer's
specifications and UBC Chapter IS
ROOF DRAINAGE
Drainage to be provided per UBC Section 1506
FINAL
Building Numbers - 5" numbers of contrasting color
posted near main entrance of building and visible from
street per City Ordinance
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca1138S-2294. Measures shall include installation of sik fencing and
graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt
debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and akernate braced wall panels
(ABWP) require inspection prior to cover..
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
7. A minimum of twenty-four hours notice is required. Public Works aooroval must be received arior to
Call 48 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 3
Permit #BLD00-148
8. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
9. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
10. Revisions require submittal & approval prior to making changes in the £eld. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
11. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.