Loading...
HomeMy WebLinkAboutBLD00-147Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend W A 98368 (Phone) 379-3208 (Fax) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2244 for Inspection Permit Number: BLDOO-147R-2 Issued: 7/25101 Parcel Number: 957602601 Job Address (new): 731 West Park Avenue Zoning: CII Type: V_N Occupancy: B Total Occupant Load: 5 Nature of Work: Revision #2: provide handicapped access by reconfit=urine deck, stairs and ramp. Applicant/Owner: Nesting Bird Yurt Company Contractor: Owner GENERAL CONDITIONS APPLY - 5EE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 SEE ORIGINAL PERMIT BLD00-147 FOR OTHER REQUIRED INSPECTIONS REOiJIRED INSPECTIONS APPROVED/DATE 1~J FOOTINGS Setbacks Deck Pier Footings Post Base FLOOR FRAMING/DECK All framing members to be pressure treated or wood of natural resistance to decay Posts Beam Joists Positive Connection Post-to-Pier Post-to-Beam Treated Wood to Concrete Lag Bolts @ ledger Blocking FINAL Guardrails Handrails Ramp Page 1 of 2 '. Waterman 8e Ka[z Building 181 Quinry Street Sui/e 301 PoR Townsend WA98368 (Phone) 379-3208 (Fex) 383-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-147R-1 Issued: 8/25/0o Parcel Number: 957602601 Job Address (new): 731 West Park Avenue Zoning: CII Type: V-N Occupancy: B Total Occupant Load: 5 Nature of Work: ApplicantlOwner: Nesting Bird Yurt Comnanv GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 - - / ~/~ Contractor: Owner ~~y7 g/ D/ ~~~,~ l ~0` ~C~D. ~~pf~~ SEE ORIGINAL PERMIT BLD00-147 FOR OTHER REQUIRED INSPECTIONS ~ FOUNDATION/FLOORFRRMING NOTE: See attached PBS structural panel floor system ~~ ,G//,~ ~~/~ engineering from Ellisport Engineering 'j ~/ [~ '-~ Engineered Beams Joists Blacking Posts Shield under Posts Positive Connections • Page 1 of 2 Waterman & Katz Building I81 Quircy Street Suite 701 Port Townsend, WA 98368 (Phone)379-3208 (Fax)783-7673 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOO-147 Issued: 8102/00 Parcel Number: 957602601 Job Address: 2319 Washington Street Zoning: CII Type: V-N Occupancy: B Total Occupant Load: 5 Nature of Work: Erect 27' temporarv model home/office vurt to be used for temporarv sales office along with the replacement of an existing fence adjacent to and south of the vurt Applicant/Owner: Nesting Bird Yurt Company Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 *SEE ALSO FIRE DEPARTMENT REQUIREMENTS IN ATTACHED MEMO DATED 7/21/00* RF.OiJiRF,D INSPECTIONS APPROVED/DATE ~ TEMPORARY EROSION & SEDIMENT CONTROL See General Condition #2 Silt Fence Drive Off Mat FOOTINGS Setbacks ~ 1 ~~~ ~~ l Footings Forms - Reinforcement -lap reinforcing stee118"per engineer FOUNDATION/FLOORFRRMING ,y (~ ll~lL~4 ~n ~~~'~' 6/S<*-+'-~ NOTE: PBS structural panel floor system requires j revision from engineer Engineered Beams Joists Blocking Posts Shield under Posts Positive Connections Page 1 of 3 v r , Building Pmnit #BGD00-107 • 2. Temporary erosion and sediment control (TESC) measures shall 6e installed on-site and inspected prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduline the Buildin>? Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. S. Al! building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 3'79-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ONSITE WITH THE APPROVED PLANS. Page 3 of 3