HomeMy WebLinkAboutBLD00-143Waterman & KalzBwlding
181 Quincy Snce~ Suite 30I
Pon Towruend, WA 98368
Plwne: (360)379-3208 Fsx: (360)385-7615
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-143 Issued: 7119100 Parcel Number: 946800605
Job Address: 355 E Street Zoning: R-2 Type: V-N Occupancy: R-3
Nature of Work: Construct New Foundation - remodeUaddition/decks/norches not included in this aermit
Owner: Patricia Selbv
Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
NOTE: FOUNDATION PERMIT ONLY.• subsequent structure must be comaatible
with this foundation design and comply with anolicable codes
RF,niIiRF,D INSPF.CTinNS
APPRnVF.I)/nATE
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2 -install on-site as needed
during construction to prevent sediment from leaving the
site and to eliminate tracking of soil onto the street
FOOTINGS
Setbacks ~~~~~~d /v~
Footings
Forms
Reinforcement
Interior fo
ot
in
gs
~
j
~
~~ i c:[/
FOUNDATION
Stem Wall ~//2/O~
Forms ( `J
Reinforcement
Anchor Bolts w/ 2" x 2" x 3/16" square washers
Vents - IO required
Girder to Concrete
Beam Pockets
Positive Connection
Treated Wood to Concrete
Shield under Posts
6 mil black poly
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~~ a aiuoo-ias
FINAL
House Number -check for 5" numbers
Smoke Detectors required throughout existing
house per 1997 UBC: one in each sleeping room
and in each area/hallway leading to each sleeping
room with a minimum of one detector on each floor;
battery powered okay in existing construction
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
num er and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties,
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates -~~
1-800-424-5555
Page 2 of 2