Loading...
HomeMy WebLinkAboutBLD00-143Waterman & KalzBwlding 181 Quincy Snce~ Suite 30I Pon Towruend, WA 98368 Plwne: (360)379-3208 Fsx: (360)385-7615 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-143 Issued: 7119100 Parcel Number: 946800605 Job Address: 355 E Street Zoning: R-2 Type: V-N Occupancy: R-3 Nature of Work: Construct New Foundation - remodeUaddition/decks/norches not included in this aermit Owner: Patricia Selbv Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: FOUNDATION PERMIT ONLY.• subsequent structure must be comaatible with this foundation design and comply with anolicable codes RF,niIiRF,D INSPF.CTinNS APPRnVF.I)/nATE TEMP EROSION & SDM'T CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street FOOTINGS Setbacks ~~~~~~d /v~ Footings Forms Reinforcement Interior fo ot in gs ~ j ~ ~~ i c:[/ FOUNDATION Stem Wall ~//2/O~ Forms ( `J Reinforcement Anchor Bolts w/ 2" x 2" x 3/16" square washers Vents - IO required Girder to Concrete Beam Pockets Positive Connection Treated Wood to Concrete Shield under Posts 6 mil black poly Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 ~~ a aiuoo-ias FINAL House Number -check for 5" numbers Smoke Detectors required throughout existing house per 1997 UBC: one in each sleeping room and in each area/hallway leading to each sleeping room with a minimum of one detector on each floor; battery powered okay in existing construction Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration num er and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca1138S2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties, 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates -~~ 1-800-424-5555 Page 2 of 2