Loading...
HomeMy WebLinkAboutBLD00-141Waterman & I(atz Building 181 Quincy SL, Suite 301 Port Townsend, WA98368 Phone (360) 379-3208 Fax: (360) 385.7675 • C'TTY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD00-141 Job Address: 1727 & 1729 Jefferson Street Issued: 7/11/00 Parcel Number: 957306506 Zoning: R`II Type: VV=N Occupancy: RR=3 Total Occupant Load: No Chance Nature of Work: Remove existing wood shingle roof, replace sheeting and install asphalt shingle roof. Owner: Laveda Gaskell Contractor: Affordable Contracting (385-24501 GENERAL CONDITIONS APPLY -SEE LAST PAGE AFl1TT712FT1 TNCPF.CTT(1NC APPROVED/DATE 1WJJ V 11~~a.i i DEMOLTITON All construction debris to be deposited in Jefferson County Landfill per plans or other location in accordance with all local, state and federal laws. SHEATHING ~7 d J / 7/16" OSB requires 8d @ 6" o.c. edges & C~l O~~~ _ 12" field or 1 3/4" staples @ 6" o.c. edges and field. ROOF VENTING Net free ventilation azea shall not be less than 1 sf/150sf of the area of the space ventilated, if 50 percent of the required ventilation area is located at least 3' above the eve or cornice vents the net ventilation area may be lsf/300sf. Openings shall be covered with corrosion resistant'/<" mesh. FINAL House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pttmi[ #BLD00-141 GENERAL CONDITIONS 1. Contractors working on this projeM are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and gravek:d construction entrance (sce attached details). Adjacent rights-of--way shall be kept frce of dirt debris.8oils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with sceding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversce correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your projeM until Public Works requirements have bcen completed and inspeMed. For Public Works inspection ca11385-2294, press 3. scheduling the Building Deaartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. A11 building permits ezpire if no progress has bE done by the Building Department within one year, building permit active. en made within siz months, or if no inspections are Call for at least one inspection per year to keep youe 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 2 of 2