HomeMy WebLinkAboutBLD00-141Waterman & I(atz Building
181 Quincy SL, Suite 301
Port Townsend, WA98368
Phone (360) 379-3208 Fax: (360) 385.7675
•
C'TTY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-141
Job Address: 1727 & 1729 Jefferson Street
Issued: 7/11/00 Parcel Number: 957306506
Zoning: R`II Type: VV=N Occupancy: RR=3
Total Occupant Load: No Chance Nature of Work: Remove existing wood shingle roof,
replace sheeting and install asphalt shingle roof.
Owner: Laveda Gaskell Contractor: Affordable Contracting (385-24501
GENERAL CONDITIONS APPLY -SEE LAST PAGE
AFl1TT712FT1 TNCPF.CTT(1NC
APPROVED/DATE
1WJJ V 11~~a.i i
DEMOLTITON
All construction debris to be deposited in
Jefferson County Landfill per plans or other
location in accordance with all local, state
and federal laws.
SHEATHING ~7 d
J /
7/16" OSB requires 8d @ 6" o.c. edges & C~l O~~~
_
12" field or 1 3/4" staples @ 6" o.c. edges and
field.
ROOF VENTING
Net free ventilation azea shall not be less than
1 sf/150sf of the area of the space ventilated,
if 50 percent of the required ventilation area
is located at least 3' above the eve or cornice
vents the net ventilation area may be
lsf/300sf. Openings shall be covered with
corrosion resistant'/<" mesh.
FINAL
House Numbers - 5" numbers of contrasting
color posted near main entrance of house and
visible from street per City Ordinance
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pttmi[ #BLD00-141
GENERAL CONDITIONS
1. Contractors working on this projeM are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and gravek:d construction entrance (sce attached details). Adjacent rights-of--way shall be kept
frce of dirt debris.8oils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with sceding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversce correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your projeM until Public Works
requirements have bcen completed and inspeMed. For Public Works inspection ca11385-2294, press 3.
scheduling the Building Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. A11 building permits ezpire if no progress has bE
done by the Building Department within one year,
building permit active.
en made within siz months, or if no inspections are
Call for at least one inspection per year to keep youe
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 2 of 2