HomeMy WebLinkAboutBLD00-139Waterman & Katz Building
I81 Quincy Street Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 379fi923
•
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
~ THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-139R-2 Issued: 08!09101 Parcel Number: 987600309
Job Address: 811 22'"' Street Zoning: R`II Type: V`N Occupancy: RR=3
Total Occupant Load: 3 Nature of Work: Revision #2: change heating from electric to nroaane.
Owner: David and Casey Gluckman Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
See original permit BLD00-139 for other inspections.
RFC1i1iRFT1 TNRPF.f'TinNS
APPRnVF.D/DATF.
FRAMING qq
~
~
Windows - U factor .45 or better ,~ , If , ~b
Doors - .40 or better ~ •/ z9 6 ~
INSULATION
Walls (R-19) ,
FINAL
Final -Building ~~D'Jj'
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD00-I39R-2
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construMion entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-tour hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for non-
residential projects.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (374-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 2 of 2
Watemun & Katz Building
l81 Quinry Stn<t Suite 301
Port Townsend WA98368
phone (360) 379-3208 Fsx (360) 3795923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-139R-1 Issued: 7125100 Parcel Number: 987600309
Job Address: 811 22""Street Zoning: R-11 Type: VV=N Occupancy: UU=1
Total Occupant Load: 1 Nature of Work: Detached shed accessory to Single-family Dwellin¢
Owner: David and Casev Gluckman Contractor: Same as Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED_
Electrical -Contact Labor & Industries @ 360-417-2702
~nr. ~7rmr, n TI~TCUL'!"TT(11UC
A PPR ()Vx;n/nATE
i~a:+ via~a_.L i
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Silt Fence as needed
Drive Off Mat (see Permit #BLD00-139)
S Setbacks
~~~!~~ /~
~/~"~
Forms
Monolithic Slab Foundation
Reinforcement
Anchor Bolts
ER ~~
FRAMING
Walls
Roof/Ceiling -engineered truss plan shall be on-
site at time of inspection
Windows -safety glazing (~
n
Headers ~
Truss Positive Connection
Blocking ~ 1~o Jv 1
Weather Resistive Barrier ( //
Call 48 hours before you dig for utility line -ocates
1-800-424-5555
Page 1 of 2
Building Permit #BI.D00.IJ9R•1
RE UIRED INSPECTIONS APPROVED/DATE
FINAL
Final -Building
GENERAL CONbITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3, Measures shall include installation olsilt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adj acent properties. -
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3.
7, Finer] Inspections are required prior to .occupancy; a Certificate of Occupancy is required for non-
residential projects.
8, All building permits ezpire if no progress .has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9, Revisions require submittal and approval. Urior to making changes in the field. Contact the Building
Department (379-3205) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Y
~•
•
•
i
City of Part Towsend
Wa4mman & Katz Buildi~
181 Quinry Street Suile JOl
Port Townsend, WA98368
Phone (360) 379-3208 Faz.(360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
" THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number:. BLD~~-139
Job Address: 811 22"" Street
Issued: 7/25/00 Parcel Number: 987600309
Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load: 3 Nature of Work: Construct Single-family Dwelline (see BLD00-139R-1
for shed construction)
Owner: David and Casev Gluckman_ Contractor: Same as Owner (Blue Aeron - Rostra
GENERAL CONDITIONS APPLY -SEE LAST PAGE
L ~ , ~ ICPirZ~s
SEPARATE PERMITS REQUIRED: ~, /~
Electrical -Contact Labor & Industries @ 360-417-2702 p /Z q~p Z(~/
RF(1TTTRFT- TNRPF('TTnNR APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See General Condition #2
Silt Fence
Drive Off Mat
GROUNDWORK PLUMBING
Pressure Test
Pipe joints
~.
6 ~L J`rlll~-~
~ l2tl~ vu
Pipe Bedding
Trap Seal Protection required for floor drain (if
a li
i
bi
H
d
Fl
H
T
_ p /'
~
~
J
I
ron
ng
y
c
oor
eat
u / t (,,x
d ~/ ~
~
Z r u~
FOOTINGS
NOTE: $efer to typical footing, on sheet A4 of ~~(~~~
plans and footing @ 4 foot retaining wall on sheet
AS of plans
Setbacks
Footings
Forms
Re ment
~~
~~~
Porch Piers
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #BLDDO-139
REQUIRED INSPECTIONS APPROVF'D/DATF.
FOUNDATION/RASTRA WALLS
(~gL~C 5 9 f ~
d 0
NOTE: Refer to engineered Rastra Construction Details, l
sAeets A4 & AS of plans; structural talcs attached for
reference.
Reinforcement
Waterproofing/Damproofing
SLAB
Hydronic Heat Tubing ~ k ' {Zbb G
R-1D Rigid Insulation ~ o , o i
PLUMBING:
~
Rough-In (D-V-T & CleamOuts) ~ C
~ ~ ~ ~ o • 6 1
Water Su ply
ter nd dishwasher
Hose Bibs (backflow protection required)
Pipe Insulation..
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior;
6" - 24" above ground
MECgANICAL
Electric Boiler - marnrfacturer's installation instructions
shall be on-site at time of inspection
Whole House Fan -bath
Source Specific Fans
Environmental Air Exhaust ducting (with backdraR
dampers), insulation (R-4) and terminus (located 3'
from opening)
FRAMING:
NOTE: Engineer,~d roof truss plan shall be on-site at time of
inspection
Walls - s¢e engineered construction details, sheet A4
Roof -See engineered truss connection details, sheet A4 ~~
Solid Blocking 9 ~
Seismic Anchors -Simpson H3 ties it 1 (~
l
`
Positive Connection - A35 b
Windows Ufactor - .32 or better
NFRC window sticker must be on (~
_\
windows and doors at inspection time V
Air Seal
Fresh Air Intake indow)
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
'r
Building Permit #BLD00-139
S
~]
FRAMING (cont'd)
Door UFactor - .20 or better
Fire Blocking
Attic Venting -ridge & eave
Ceilings
Lintel -see engineered detail, sheet AS
Windows -escape
Windows -safety glazing
~ j
~~1,,,,!!ll~~~~
~{' , ~(~ " v
U
(~ ~~-- ,
INSULATION _________~/ _ ~v (Lr ~) ~
~~ Tjn~ SC ab
~
Slab (R-10)
Wall (R-27 Rastra) _ ta
~ ~ Jd1 l lt2_ N~ P X ~ ~ 12
L1 v~
Ceiling (R-30) ~0}7 (~ JK. ~ p~v r
Baffles
Vapor Barrier. Paint ('~~ g~2~/~(
FINAL
Public Works Sign-Off
House Number - 5"
Plumbing
Mechanical
Insulation Certificate
Vapor Barrier Paint Certificate
Porch
Smoke Detectors (/
~
~y
Final -Building ~
~
~"/
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration numbernumber and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized
with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
• 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
Building Pmnit 1tSLD00-139
..
5. Re-inspection is required after any corrections are completed. ~~
6.. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Pubhc Works mspectlon ca11385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if na progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4