HomeMy WebLinkAboutBLD00-138
Waterman & Katz Building
181 Quincy SL, Suite 301
PoR Townsend, W A 98368
Phone (360) 379-3208 Fax: (360) 3796923
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD00-138
Job Address: 1440 Franklin Street
Total Occupant Load: No Change
Owner: Linda Pfafman
Issued• 7/10/00
Zoning: RR=II Type: VV=N
Parcel Number: 989711005
Occupancy: RR=3
Nature of Work: Remove existing wood shingle roof.
replace sheeting and install asphalt shingle roof.
Contractor: Hope Roofing (385-5653)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REOiJIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in
Jefferson County Landfill per plans or other
location in accordance with all local, state
and federal laws.
SHEATHING
7/16" OSB requires 8d @ 6" o.c. edges &
12" field or 1 3/a" staples @ 6" o.c. edges and.
field.
ROOF VENTING
Net free ventilation area shall not be less than
lsf/150sf of the area of the space ventilated,
if 50 percent of the required ventilation area
is located at least 3' above the eve or cornice
vents the net ventilation area may be
1sfl300sf. Openings shall be covered with
corrosion resistant'/." mesh.
FINAL
House Numbers - 5" numbers of contrasting
color posted near main entrance of house and
visible from street per City Ordinance
Final -Building
Ca1148 hours before you dig for utility Tine locates
1-800-424-5555
Page 1 of 2
Pemti[ #BLi700-~1}~
' GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construMion; call385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-ot--way shall be kept
free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have bcen completed and inspected. For Public Works inspection ca11385-2294, press 3.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within siz months, or if no inspections are
done by the Building Department within one year. Call for at least one inspeMion per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2