CITY OF PORT TOWNSEND
n
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-136 Issued: 7118/00 Parcel Number: 989-706-406
Job Address: 300 Calhoun Street Zoning: R~II Type: V_N Occupancy: R-3
Total Occupant Load: add 1 Nature of Work: Replace windows in existin¢ house; convert
earaee to livine saace
Owner: Jan Marauardt/Tomoko Shaffer Contractor: Hunt Construction
Greg Copley 301-1567
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REOiTIRED INSPECTIONS
APPROVED/DATE
DEMOLITION
Materials from demolition shall be taken to the
Jefferson County ill or other approved off-site
location in accordance with all state and local laws
FLOOR FRAMING
Joists n ~,+~~ ~ , ~/~l/j~,~
~~`~'
Blocking /
Positive Connection
Foundation Vents - 4 required
PLUMBING
Rough-In (D-V-T & Clean-outs) n / /~,r, n n
Z/~~~1%T/ (p
,J
Water Supply ~
Pipe Insulation (R-3)
Pressure Reduction Valve if pressure > 80 psi
Water Heater
- strap @ 1/3 points
- pressure relief valve drain to exterior
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 4
P~ a swoo.tfe ~. _
RE UIRED INSPECTIONS APPROVED/DATE
MECHANICAL
Whole House Fan -Bath #I
ql ~ ~ Q
Master Bath Fan
Kitchen Fan
Environmental Air Exhaust ducting (with backdraft
dampers), insulation (R-4) and termination (3' from
openings into building)
FRAMING:
Walls
Ceilings
~ ~ ~ ~~~~ n n
(J `
/
Roof 666 ~~
-
Attic Venting -gable end and eave
Windows -escape
Window U-factor - .36 or better in new space; .40
or better prescriptive in existing house
NFRC sticker shall be on windows at time of
Inspection
Windows -safety glazing
Air Seat
Fresh Air Intake -windows
Door U-factor - .20 or better
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Exterior Walls (R-21) /~, , , ,f ~ v, h
•
Ceiling (R-38)
f~y~'"L~, ,,
~/
~ ~ Gam'
Battles
V
B
i
i (/l yj,~~~d ~ ~_ }~
Cam/
apor
arr
er -pa
nt ~ I ~ ~
DRY WALL NAILING
Walls
Ceiling
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pamil#BIA00-I36
FINAL
House Numbers -check for 5" numbers
Insulation Certificate
Vapor Barrier Paint Certificate
Smoke Detectors -existing residence to be
upgraded for smoke detectors per 1997 UBC
P-umbing
Mechanical
Deck
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover. ~
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done
by the Building Department within one year. Call for at (east one inspection per year to keep your
building permit active.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
PamitNBLD00.13P--~,,. ~.
t--~
9. Revisions require submittal and approval arior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555