Loading...
HomeMy WebLinkAboutBLD00-136Watuman ~ KelzBuifding 181 Qwlry 34x1, Stile 301 PM Towmend, WA 96368 Phom: (360) 379-3208 Fu: (360) 385-7675 CITY OF PORT TOWNSEND n CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOO-136 Issued: 7118/00 Parcel Number: 989-706-406 Job Address: 300 Calhoun Street Zoning: R~II Type: V_N Occupancy: R-3 Total Occupant Load: add 1 Nature of Work: Replace windows in existin¢ house; convert earaee to livine saace Owner: Jan Marauardt/Tomoko Shaffer Contractor: Hunt Construction Greg Copley 301-1567 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REOiTIRED INSPECTIONS APPROVED/DATE DEMOLITION Materials from demolition shall be taken to the Jefferson County ill or other approved off-site location in accordance with all state and local laws FLOOR FRAMING Joists n ~,+~~ ~ , ~/~l/j~,~ ~~`~' Blocking / Positive Connection Foundation Vents - 4 required PLUMBING Rough-In (D-V-T & Clean-outs) n / /~,r, n n Z/~~~1%T/ (p ,J Water Supply ~ Pipe Insulation (R-3) Pressure Reduction Valve if pressure > 80 psi Water Heater - strap @ 1/3 points - pressure relief valve drain to exterior Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 4 P~ a swoo.tfe ~. _ RE UIRED INSPECTIONS APPROVED/DATE MECHANICAL Whole House Fan -Bath #I ql ~ ~ Q Master Bath Fan Kitchen Fan Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and termination (3' from openings into building) FRAMING: Walls Ceilings ~ ~ ~ ~~~~ n n (J ` / Roof 666 ~~ - Attic Venting -gable end and eave Windows -escape Window U-factor - .36 or better in new space; .40 or better prescriptive in existing house NFRC sticker shall be on windows at time of Inspection Windows -safety glazing Air Seat Fresh Air Intake -windows Door U-factor - .20 or better Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Exterior Walls (R-21) /~, , , ,f ~ v, h • Ceiling (R-38) f~y~'"L~, ,, ~/ ~ ~ Gam' Battles V B i i (/l yj,~~~d ~ ~_ }~ Cam/ apor arr er -pa nt ~ I ~ ~ DRY WALL NAILING Walls Ceiling Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pamil#BIA00-I36 FINAL House Numbers -check for 5" numbers Insulation Certificate Vapor Barrier Paint Certificate Smoke Detectors -existing residence to be upgraded for smoke detectors per 1997 UBC P-umbing Mechanical Deck Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. ~ 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Departments final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits ezpire if no progress has been made within siz months, or if no inspections are done by the Building Department within one year. Call for at (east one inspection per year to keep your building permit active. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 PamitNBLD00.13P--~,,. ~. t--~ 9. Revisions require submittal and approval arior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page4of4