HomeMy WebLinkAboutBLD00-134r
Waterman @ Katz Building
181 Quincy Street Suite 301
PoM1 Townsend, W A 98368
Phone 379-3208 Fax 385-7675
•
CITY OF PORT TOWNSEND.
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-134R-2 Issued: 8102/01 Parcel Number: 957306704
l~
Job Address: 1932 Washin¢ton Street Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load: NC Nature of Work: Reinstall four (4) dormer windows in tower
Owner: Frank and Patricia Durbin Contractor: Townsend Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RFfTTTTRFTI TNCPFfTTC1N.C
APPRfIVF.TI/nATF.
FRAMING
Walls
Ceiling
Roof
Collar Ties
Roof Venting
Windows -unheated space
Positive Connections
Fire Blocking
Weather Resistive Barrier
FINAL
house Numbers - 5" minimum
Smoke Detectors throughout existing construction
Final -Building
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 1 of 2
..
Building Permit #OOd34R4 ..
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor Rc Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC} measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed,
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3;
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Departments final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. A11 building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prioY to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
Waterman @ Katz Building
181 Quinry Street Suite 301
Part Townsend, WA9836S
Phone 385-7609 Fax 385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOO-1348-1 Issued: 8/18100 Parcel Number: 957306704
Job Address: 1932 Washin¢ton Street Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load: NC Nature of Work: Reinforce existinf? foundation wall, east side
Owner: Frank and Patricia Durbin Contractor: Townsend Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-4I7-2702
RF.(1TTTRF.n TNSPECTTnNS
APPROVED/DATE
TEMPORARY EROSION/SEDIMENT CONTROL
Applicant/contractor shall install control measures as
needed during construction to ensure that sediment does
not impact neighboring properties and is not tracked onto
City rights-of--way. Measures may include installation of
graveled construction entrance, tire wash and/or sweeping
of paved surfaces.
FOOTINGS
Setbacks
Footings -12 " x I2 "per engineered detail
Forms
Reinforcement - (2) #4
FOUNDATION
j 'd°
Stem Wall -per engineering ~,
2
Forms ~
l
1
Reinforcement -
horizontal: (5) #4 bars; vertical: #4 @ 16" o. c.
Lag $olts - S/8"
Vents
Flitch Plates (/
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Pmnit #00.134R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this. documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construMion shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shalt review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3~
minimum of twenty-four hours notice is required. Public Works approval must 6e received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress .has been made within six months, or if no inspections are
done by the Building Department within one year. Csll for at least one inspection per year to keep
your building permit active.
9. Revisions-require review and approval prl0! to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
•
•
Watennsn & Katz Building
I8l Quincy Stmt Suile 30!
PM Townsend, WA 98368
Phone 383-7609 Faz 383.7673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOO-134 Issued: 7121/00 .Parcel Number: 957306704
Job Address: 1932 Washineton Street Zoning: R-11 Type: VV=N Occupancy: RR=3
Total Occupant Load: NC Nature of Work: Addition to Sinele-family Dwelling
Owner: Frank and Patricia Durbin Contractor: Townsend Builders
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF(1TTTRFTI TNCPF.C'TT(1NS
~-~, a . Expl ~
n o /~-d
7~7'~~ ~~31 ~ ~ ~~Zt d''~~.
~ ~~ 1- h ~ ~
APPRnVF,D/1)ATE
TEMPORARY EROSION/SEDIMENT CONTROL
Applicant/contractor shall install control measures as
needed during construction to ensure that sediment does
not impact neighboring properties and is not tracked onto
City rights-of--way. Measures may include installation of
graveled construction entrance, tire wash and/or sweeping
of paved surfaces.
FOOTINGS r~-,_r <;; ~; <- E'~'r.~~ %" ~ ire; ~ r'
Setbacks n , : ~'~~ ~?~
Footings
Forms
Reinforcement
FOUNDATION
Stem Wall
F
s e ~~~1
~
orm 12~,
~
Reinforcement ~~ ~Lv l
`G.
Anchor Bolts ~
`
2S
Vents g'
Crawl Access
Engineered Holdowns
l
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
~'
r
.. ,
Building Pamh H00.134 i
REQUIRED INSPECTIONS APPROVED/DATE
FLOOR FRAMING
Joists
Blocking
Positive Connection
Treated Wood to Concrete
Anchor Bolts and Washers
Foundation Vents
PLUMBING:
Rough-In (D-V-T & Clean Outs) ~ ~ n t
~~ Z QO `('~i(
Water Supply 1
Hose Bibs (backflow protection required)
Pipe Insulation - R-3
Pressure Reduction Valve if > 80 psi
Water Heater -Seismic Restraint
MECHANICAL
LPG f
rn
c
i
he
t ~ , e ~ APP~,R,,,c~s E~p-t'
P P
u
(
a
e
s
a
source) ~/12AlAL~ ddr2~~7 'l~.-
Source Specific Fan in Bath //
Environmental Air Exhaust ducting, insulation
(R-4) and terminus (located 3' from opening)
FRAMING
Walls
Engineered Sheathing @ Den
Ceiling
Roof
Attic Venting - eave and gable end
Window safety glazing
Window U-factor - .75 or better
(verify high efficiency furnace)
Air Seal
Rafter Positive Connection
Fire Blocking
Weather Resistive Barrier
INSULATION G , , n~ - ~ 2 l ~ /~
ClXJ~''
G
4
Walls (R-19
Floors (R-19) .
/~
p/
~ ~` ~ ~/~? a~ (~
Ceiling (R-30) /
Vapor Bamer required:
- faced Batts
- Vapor Barrier paint
- 4 mil poly
Crawl Space - 6 mil poly
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
," , Building Permit #00-134
~ RF(liiTRFTI TNCPFC'TTfl1VR APPRnVED/DATE
n
LJ
DRY WALL NAILING
Walls
Ceiling 7~
~ - I f ~6~
FINAL
House Number -check for 5" numbers
Plumbing
Mechanical
l ~~ ~~ ?/, C~~~ nn
"`~" `-~
e
Vapor barrier paint certificate, if applicab
Smoke Detectors required throughout per UBC: 4{
one in each sleeping room and in each j
,
area hallway leading to each sleeping with a
minimum of one on each floor : f:
~~ r
~
Final -Building ~
~
GENERAL CONDITIONS
.-= .,
1. Contractors working on this project are required to have a Labor & Industries contractor's
• rePistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294, press 3. 1Vleasures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept
free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
Ca1148 hours before you dig Tor utility line locates
1-800-424-5555
Page 3 of 4
4 ~
a
Building Petm8g00.134
8.. All building permits ezpire if no progress has. been made within siz months, or if no inspections al~
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THiS PERMIT ON-SITE WITH THE APPROVED PLANS.
\J
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Yage 4 of 4